My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting Memorandum 09/08/2003 (B)
CWCB
>
Board Meetings
>
DayForward
>
1001-2000
>
Board Meeting Memorandum 09/08/2003 (B)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2014 2:25:55 PM
Creation date
9/10/2014 2:25:54 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/8/2003
Description
Non Reimbursable Investments Weather Modification Program Demonstration Projects
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Non-reimbursable Investment Application-CWCB Construction Fund <br /> • Form Revised August 8,2003 <br /> 6. Will the acquisition of additional water rights be necessary? YES NO X_ <br /> If"YES",please explain: <br /> If"NO", describe existing rights: <br /> Water Right CFS. Average water diverted per year Acre-feet <br /> 7. Please list the names and addresses of any technical or legal consultants retained to <br /> represent the applicant or to conduct investigations for the proposed project or study: <br /> NAME ADDRESS and PHONE <br /> • 8. List any feasibility study or scope of work that has been completed or is now in progress for <br /> the proposed project or study. (Please submit one copy with this application): <br /> There is an attached paper about the I Itah Division of Water Resources offering <br /> similar such grants to water users to cost share in programs and assist in a creating a steady <br /> • • 11• 1 i. 1 Si, - 11 . s •J . 11 <br /> 9. What is the estimated cost of the project or study? Please include estimated Planning, <br /> Engineering,and Construction costs, if known: <br /> Estimated Planning/Study Costs: $ <br /> Estimated Engineering Costs: $ <br /> Estimated Construction Costs: $ <br /> Estimated Total Costs: $ <br /> • <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.