My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting Memorandum 09/08/2003 (B)
CWCB
>
Board Meetings
>
DayForward
>
1001-2000
>
Board Meeting Memorandum 09/08/2003 (B)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2014 2:25:55 PM
Creation date
9/10/2014 2:25:54 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/8/2003
Description
Non Reimbursable Investments Weather Modification Program Demonstration Projects
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
66 JOURNAL OF WEATHER MODIFICATION VOLUME 33 <br /> There are six active project areas in Utah. Five <br /> large-scale project areas using ground based silver <br /> iodide generators include: I the Central/Southern <br /> • <br /> Utah and the (2) Tooele County Project areas, <br /> sponsored by the Utah Water Resources <br /> ,. Development Corporation; the (3) West Box Elder <br /> and (4) East Box Elder/Cache County Project areas, <br /> sponsored by the Bear River Water Conservancy <br /> • <br /> (, xs>y •: District and Cache County; and the (5) West Uintas <br /> .'. ;iµ,� Project Area sponsored by the Weber Basin Water <br /> Conservancy District and the Provo River Water <br /> : : Users Association_ The total estimated cost for these <br /> ?. 4. . „. ; 1_$, •:. projects is $321,9.00, of which the state will cost <br /> ry..; c' ?: ' '; ';' 'rr.F, : share 46.7 percent ($150,000). Emery Water• <br /> s ? Conservancy District is operating a small-scale <br /> project using liquid propane to seed the Wasatch <br /> Plateau above Joes Valley Reservoir. This is a <br /> continuation of part of the NOA A/Utah Research <br /> ' `" Project conducted in the 1990s.••' :,:, ''t:.ry`} ti' '� ; ": ,•,A The Central/Southern Utah Project has operated <br /> continuously since water year 1974, with the <br /> exception of the extreme wet period from 1984-87. <br /> The project has 23 seeded seasons. In some of the <br /> early years when higher state funding was available, <br /> 6. WINTER PROJECTS multiple cloud seeding aircraft, weather radar, and <br /> • rawinsonde operations were used to supplement the <br /> A map of the winter projects in Utah for snow ground based silver iodide generator network. The <br /> pack augmentation since passage of the 1973 Cloud project area currently has 65 cloud seeding <br /> Seeding Act is shown on Figure 3. The map also generators. Using a target and control regression <br /> indicates the currently active projects (2001) as well analysis for December through Mardi precipitation, <br /> as inactive projects. The contractor for all of the the Central/Southern Utah Project Area indicates a 14 <br /> winter projects is North American Weather percent average increase in high elevation target <br /> Consultants, Inc., of Sandy, Utah. The goal of these precipitation for this period (Griffith and Solak, <br /> projects have primarily been to augment spring and 2000a). <br /> summer streamflow to benefit agriculture interests, <br /> although some projects have been conducted to Seeding began. in the Tooele County Project <br /> augment municipal water supplies. Area in 1976 and continued through the 1982 water <br /> year. Seeding resumed in 1989 through 1992 and <br /> 6.1 Inactive Projects again in 1996 to the present. There are 16 seeded <br /> seasons. The project area has nine cloud seeding <br /> There are six inactive project areas. The Ogden generators. Target and control regression analysis <br /> River Project Area was cloud seeded in water year shows a December-March high elevation target <br /> 1977 and water years 1991 through 1993. The precipitation average increase of 19 percent(Griffith <br /> Wasatch Front Project was operated for 10 years in and Solak,2000a). <br /> water year 1977 and water years 1988 through 1996. <br /> The Uinta Mountains were cloud seeded in water The East Box Elder/Cache County Project Area <br /> years 1977 and 1978 and again in 1989. The Carbon has operated 12 years, beginning in 1989. The <br /> County and La Sal Mountains projects were operated project area has 22 cloud seeding generators. Target <br /> in water years 1978 through 1983 and 1990, for a and control regression analysis shows a December- <br /> total of seven years. The Abajo (Blue) Mountains February high elevation target precipitation average <br /> Project was operated for 12 years in water years 1976 increase of 20 percent (Griffith and Solak, 2000b). <br /> through 1983 and again in water years 1990 through <br /> 1993. <br /> 6.2 Active Projects(2001) <br /> • <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.