My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting July 2014 Agenda Item 23a
CWCB
>
Board Meetings
>
DayForward
>
1001-2000
>
Board Meeting July 2014 Agenda Item 23a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2014 12:03:55 PM
Creation date
8/28/2014 12:03:51 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/2/2014
Description
Upper Platte & Beaver Canal Company Hospital Road Recharge Facility and Bridge Widening Project
Board Meetings - Doc Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Upper Platte & Beaver Canal Company Agenda Item 23a <br /> July 2, 2014 <br /> Page 2 of 6 <br /> The Company also owns 36 shares of the 10,020 outstanding shares of the Riverside Reservoir and Land <br /> Company ("Riverside"). These shares entitle The Company to a proportionate share of the storage <br /> water rights controlled by Riverside. <br /> The Company owns 50 shares of the 261 outstanding shares of the Morgan-Prewitt Reservoir Company. <br /> These shares entitle the Company to a proportionate share of the storage water rights controlled by <br /> Morgan-Prewitt, which owns 6/31 of the water rights decreed to Prewitt Reservoir. <br /> On average, the Company annually provides 32,500 acre-feet of water to its members. <br /> Project Description <br /> There are two projects proposed by the Company to improve the ability to provide water to its <br /> shareholders: <br /> 1. Augmentation Pond: The Company has been given the opportunity to purchase a parcel of land <br /> currently under unrelated development that would provide a recharge site two miles from the <br /> South Platte River and thus provide the required lagging of recharge accretions. <br /> 2. Diversion dam bridge deck widening: The Company is seeking to improve the bridge <br /> infrastructure at the headgate structure at the South Platte River. This would give improved <br /> and wider access for operation and maintenance. <br /> Three alternatives were considered for this project: <br /> Alternative No. 1 - No-action: This alternative would not address the restriction on well pumping due <br /> to inadequate or ill-timed recharge accretions. In addition, this alternative would not address the <br /> inadequate infrastructure at the Company's headgate. If the project is not implemented, use of wells <br /> will continue to be restricted by available recharge accretions, thus limiting agricultural activity in the <br /> area and impacting the local economy. <br /> Alternative No. 2 - Lease Augmentation Credit: This alternative was not selected because the <br /> Company desires to have long term stability of their augmentation credits. An alternative that depends <br /> on other entities having excess augmentation credits will not be a reliable source and would be subject <br /> to factors beyond the Company's control. This would not provide the stability needed to meet out-of- <br /> priority depletions. <br /> Alternative No. 3 - Selected Project- Hospital Road Recharge Pond and Headgate Bridge <br /> Expansion: This alternative was chosen because it meets the need for the Company's recharge plan, is <br /> technically feasible, and provides infrastructure for the continued operation of both irrigation and <br /> recharge under the Company's system. <br /> Hospital Road Recharge Pond. The purpose of the Hospital Road Recharge Pond is to generate <br /> recharge accretions that can offset out-of-priority depletions caused by well pumping under <br /> the Company's system. Deliveries to the pond will infiltrate into the aquifer and percolate into <br /> the South Platte River as recharge accretions. The proposed Hospital Road Recharge Pond <br /> would be located on the north side of the City of Brush and just north of the Brush Lateral of <br /> the Upper Platte and Beaver Canal system. The parcel on which the pond sits was purchased by <br /> a construction company for development and as a source of highway construction fill material. <br /> The Company has a purchase agreement for ten acres of the overall parcel for the recharge <br /> facility. As part of the agreement, the construction company has nearly completed the <br /> excavation of the pond, which is planned to be about 9.6 acres with 4:1 side slopes and a depth <br /> of about ten feet. The Company will deliver water from the Brush Lateral into the Hospital <br /> Road Recharge Pond. A pond inlet check structure will be constructed on the canal, with a <br /> slide gate and measurement weir to divert and measure the recharge water entering the pond. <br />
The URL can be used to link to this page
Your browser does not support the video tag.