My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150016 Feasibilty Study 12/04/1997
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150016 Feasibilty Study 12/04/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 9:28:29 AM
Creation date
8/28/2014 9:20:29 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150016
Contractor Name
Idaho Springs, City of
Contract Type
Loan
Water District
7
County
Clear Creek
Bill Number
HB 98-1189
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• • <br /> Agenda Item 17h. <br /> November 24, 1997 <br /> Page 3 <br /> 3. That the financing terms for this Construction Fund Authorization (total amount of <br /> $955,000) shall be at an annual percentage rate equal to the "Standard Income" rate for <br /> a municipality (as set by the CWCB November 24 1997), for a duration of 30 years, and <br /> 4. That loan approval shall be contingent, and upon all standard contracting provisions of <br /> the CWCB, as determined by the CWCB Director, and <br /> 5. That security for the loan ($955,000) shall be a collateral interest in the stream of income <br /> derived by the City's water enterprise, from the sale of water, and a certificate of <br /> deposit in amount of one annual payment. <br /> • Attachments <br /> D:\msword\IdahoSprings97.memo <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.