Laserfiche WebLink
• • <br /> Mr. James J. White 2 <br /> City Administrator <br /> December 4, 1997 <br /> d. You must adhere to the CWCB Design and Construction Administration Procedures. <br /> Mike Serlet will work with you on the CWCB requirements concerning design and <br /> bidding of the construction project. During the construction process he will make field <br /> inspections, which will be the basis of the monthly pay estimates for disbursements of <br /> your loan funds. <br /> e. You must adhere to the CWCB Guidelines for Financial Assistance. A copy of our <br /> Guidelines has been provided to you. <br /> On behalf of the Board, I would like to thank you for applying for a Construction Fund Loan from <br /> the Colorado Water Conservation Board. <br /> 40 cerely, <br /> . Sciver, P.E. <br /> Colorado Water Conservation Board <br /> Attachment: Updated Memo:Idaho Springs97.memo <br /> cc(w/Attachment): Ms.Elizabeth Ann Rieke,Board Member CWCB <br /> cc(w/o Attachment): CWCB Section B Staff <br /> Linda Bassi,AGO <br /> D:\IdahoSprings97.ltr <br />