My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150374 Project Summary
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150374 Project Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2014 11:36:14 AM
Creation date
8/27/2014 11:36:14 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150374
Contractor Name
Boulder & Larimer County Irrigating and Manufacturing Ditch Company
Contract Type
Loan
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Boulder and Larimer County Irrigating and Manufacturing Ditch Company <br /> Emergency Inlet Ditch and Diversion Structure Repair <br /> „,01r".;;;',,. <br /> _.` <br /> -.00fit <br /> Inlet Ditch Washout Repair <br /> Project Description <br /> During the unprecedented flood of September 2013 in the tributaries to the South Platte River, a <br /> significant number of diversion structures and dams along the river corridor were damaged. The <br /> purpose of this Project is to repair the Little Thompson River diversion structure and the Ish <br /> Reservoir inlet ditch structure to allow the Company to deliver water to shareholders. <br /> Project Data <br /> Sponsor: Boulder&Larimer County County: Boulder& Water Source: Little Thompson <br /> Irrigating&Manufacturing Ditch Co. Larimer River <br /> Terms of Loan: $202,000 for 30 years @ 1.90% Substantial Completion: TBD <br /> Design Engineer: Tessara Water, LLC—Hudson, Colorado and SM&RC Structural Engineers, Inc. <br /> —Lakewood,Colorado <br /> Contractors: Concrete Structures, Inc. —Longmont, CO. &Zac Dirt,Inc.—Longmont,CO. <br /> Project Elements: The Project included the repair of the Little Thompson River diversion <br /> structure and the Ish Reservoir Inlet Ditch: The scope of work for the diversion structure repairs <br /> involved removing debris from the dam and diversion structure,forming and pouring a new wing <br /> wall on the north side of the diversion dam, and then rechanneling the Little Thompson River to <br /> flow back over the diversion dam. The scope of work for the inlet ditch washout repairs involved <br /> creating a new path for the Company's ditch through the area. This involved creating a foundation <br /> secured to bedrock and building a new water conveyance system on top of the foundation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.