Laserfiche WebLink
Monthly updates of the water accounting were submitted to the division engineer to verify that all <br /> Mo g fY <br /> • Y P g <br /> out-of-priority well depletions were augmented by the LSPWCD replacement supplies. These <br /> replacement supplies consist of both recharge accretions and pumping of augmentation wells <br /> directly back to the river. Inflows to groundwater recharge ponds result in accretions to the river <br /> lagged over a period of time. Augmentation wells are pumped directly to the river through ditches <br /> and creeks on days of river call to replace the remaining depletions not covered by recharge <br /> accretions. The use of augmentation wells also causes future depletions that must be replaced if <br /> out-of-priority. <br /> In 2003 member wells were billed for gross well pumping at$9.25 per ac-ft. Individuals with <br /> replacement water for 2003 were credited by multiplying that individual's cost of well pumping by <br /> the ratio of un-replaced depletions to total depletions. The total amount owed by an individual <br /> with replacement water was calculated by adding necessary administrative fees and operational <br /> fees to the discounted well pumping cost described above. The difference between the amount that <br /> the individual would have paid (without replacement water) and the actual amount owed was the <br /> amount of leased water purchased from individuals for augmentation in 2003. For 2003, individual <br /> water leases, other recharge accretion leases, and other augmentation well expenses are listed in <br /> appendix 1. In 2003 the lease rate was 20 dollars per acre-foot on days of call and 15 dollars per <br /> acre-foot on days of non-call. <br /> In 2004 accounting was completed for member wells by the district to assess members a dollar per <br /> acre-foot charge for depletions at the river during the period of April 1st through October 15th. <br /> • Replacement supplies were leased for augmentation in 2004 using the same process. A list of these <br /> replacement supplies and their accounting is attached in appendices 2 and 3. Augmentation well <br /> credits for 2004 are listed in appendix 2 and recharge accretions are listed in appendix 3 for 2004. <br /> The lease rate in 2004 for well augmentation was 20 dollars per acre-foot for both call and non-call <br /> periods. The individuals listed in the upper section of the appendices are LSPWCD members who <br /> have developed replacement supplies. LSPWCD leases these replacement supplies from their <br /> members to cover out of priority depletions from member wells and augmentation well pumping. <br /> This results in a net reduction in assessments for LSPWCD members who develop individual <br /> replacement supplies. <br /> LSPWCD leased recharge accretions from the Julesburg Irrigation District(JID) (appendices 1 and <br /> 3) and the South Platte Lower River Group (SPLRG) (appendices 1 and 3) in the 2003 and 2004 <br /> water years. LSPWCD also leased water from the Beavers augmentation well where the lease <br /> consists of the payment by the LSPWCD for the electrical costs from pumping and the payment of <br /> the conveyance fee to JID for delivery of the pumped water through JID ditches (appendices 1 and <br /> 2). <br /> The total LSPWCD lease payment for augmentation replacement supplies was $51,886 in 2003 and <br /> $36,647 in 2004 (Table 1). The total days of river call where LSPWCD had to replace out-of- <br /> priority well depletions during 2003 was 159 days and in 2004 was 190 days (Appendix 1). The <br /> average number of call days on the lower South Platte River is 84 days according to information <br /> provided by CWCB. The Program per the September 2004 Guidelines also provides funds for <br /> engineering and attorney fees equal to 5% of the grant amount. Engineering/Attorney fees were <br /> calculated to be $1,224 in 2003 and $1,022 in 2004. This brings the total grant for LSPWCD in the <br /> years 2003 and 2004 to $47,165 (Table 1). <br />