Laserfiche WebLink
life cycle issues of 10 years. Replacement of out of date DCPs may also be required to <br /> accommodate technology upgrades and changes which are mandated by NOAA,the <br /> Federal Agency managing the GOES satellite resource. <br /> 2. $55,000 for refurbishing existing stream gages as needed to maintain operational reliability <br /> of stream flow data collection. This is a recurring annual request to cover refurbishment <br /> and repair costs which arise due to deterioration of the physical stream gage infrastructure. <br /> The requested funding amount of$330,000 is $30,000 more than the past several years, but still <br /> below historical requests of$350,000 to $400,000. The $30,000 increase represents the revised <br /> estimates of the funding required to address the estimated 10 year life span of electronic <br /> telemetry equipment. (Further details of the DWR Satellite Monitoring System funding request <br /> are explained in the attached memo from Scott Cuthbertson to James Eklund dated July 29, <br /> 2013). <br /> • <br /> 2 <br />