Laserfiche WebLink
Non-Reimbursable Project Investment Application-CWCB Construction Fund <br /> Form Revised November 2011 <br /> S <br /> 3. Provide a brief description of your organization below: <br /> The Colorado Water Conservation Board (CWCB) was created in 1937 for the purpose of <br /> aiding in the protection and development of the waters of the state. The agency is responsible <br /> for water project planning and finance, stream and lake protection, flood hazard identification <br /> and mitigation,weather modification, river restoration, water conservation and drought <br /> planning, water information, and water supply protection. <br /> Part B.-Description of the Project or Study <br /> 1. Name of the study or project: Arkansas River Decision Support System(ArkDSS) <br /> 2. What is the purpose of this grant application? Check one. <br /> x Study <br /> Demonstration project. <br /> Rehabilitation or <br /> replacement of existing <br /> Other(Please describe) <br /> 3. General location of the study or demonstration project. (Please include county, and approximate distance <br /> and direction from the nearest town): <br /> Arkansas River Basin—Division 2 <br /> 4, Please provide a brief narrative description of the proposed study or demonstration project including <br /> purpose,need,and service area. (Attach scope of study, if available) <br /> The ArkDSS will be similar to other DSSs developed in Colorado, with data collection and <br /> development of modeling tools to aid in water resources planning and management. The <br /> feasibility study was completed in December 2011, resulting in a proposed implementation <br /> including four phases, at an estimated total cost of$7,590,000. The $500,000 requested herein <br /> will be used to continue implementation of the ArkDSS, which at this stage includes primarily <br /> data compilation and data collection activities that will provide the foundation for the ArkDSS. <br /> • <br /> 2 <br />