My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finance Committee Meeting 2006
CWCB
>
Board Meetings
>
DayForward
>
1001-2000
>
Finance Committee Meeting 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2015 3:48:30 PM
Creation date
8/18/2014 4:26:45 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/19/2006
Description
Finance Sub-Committee Meeting September 19, 2006
Board Meetings - Doc Type
Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ROCKY MOUNTAIN FEN RESEARCH 'ROJECT <br /> Timeline: Rocky Mountain Fen Research Project <br /> Tasks �a" Feb Mar Apr May lur ly Aug Sept Oct Nov Dec )ar <br /> 2007 14-0 hay 2006 Feb Mat April -O 2008 2009 2010 2011 <br /> Basin&Experimental <br /> Design <br /> Quantitative Project <br /> Targets&Performance <br /> Criteria <br /> Fen Reaper Design/ <br /> Testing is- <br /> . <br /> Water Rights Issues <br /> 4 Pk <br /> Determine source of , <br /> Liner&other Materials mr- <br /> Continue Baseline ' <br /> Monitoring Program <br /> Build Fen <br /> Transplantation Basin 411--••••—'110- <br /> Test Basin Performance <br /> Data Analysis and <br /> Reporting 4 <br /> Fen Harvest and <br /> Transplantation 41111-.—.--41. <br /> Springtime Preparabons <br /> Monitoring/Reporting . .. <br /> Adaptive Management <br /> Planning/ 4 f <br /> Implementation <br /> PRELIMINARY SKETCH 2 0 <br /> fo <br /> Preliminary Design <br /> FenReaper IHUSB VDRAUL.ICS <br /> Specially designed harvesting equipment will extract <br /> uniform blocks of fen parent material for reassembly <br /> in a hydrologically modified re-location plot. -.x.a`7,-,+1 Me ARM <br /> SL,DC GUI. ��. o <br /> VW <br /> 1111111ml <br /> NOT 70 SCALE <br /> CUTTING EDGE <br /> CUM,.EDGE <br /> ROCKY MOUNTAIN FEN REASEARCH PROJECT <br /> FEN RE-L❑CATION PL❑T 4a"4"�'" 4" "� <br /> CROSS SECTION <br /> SUB-SURFACE RECHARGE FEN PARENT MATERIAL <br /> • <br /> PRELIMINARY CONCEPT IMPERMEABLE <br /> MEMBRANE- - —�SELECT MATERIAL <br /> __. (LINER PROTECTION) <br /> COMPACTED <br /> SUBSTRATE <br /> PROFILE <br />• OUTLET INLET <br /> CONTAINMENT HARVESTED FEN MATERIAL ROCK STILLING <br /> BERM / BASIN CONTAINMENT BERM <br /> OVER FLOW SELECT MATERIAL 1 - - <br /> - BURIED <br /> - — _ - , 1 — I INLET PIPE <br /> — • —•l — — ,, _ — (8' HEAD) <br /> IMPERMEABLE <br /> MEMBRANE <br /> COMPACTED SUBSTRATE <br /> SELECT MATERIAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.