My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finance Committee Meeting 2006
CWCB
>
Board Meetings
>
DayForward
>
1001-2000
>
Finance Committee Meeting 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2015 3:48:30 PM
Creation date
8/18/2014 4:26:45 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/19/2006
Description
Finance Sub-Committee Meeting September 19, 2006
Board Meetings - Doc Type
Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT C <br /> COLORADO WATER CONSERVATION BOARD <br /> CONSTRUCTION FUND <br /> 2007-2008 NON-REIMBURSABLE PROJECT APPLICATION <br /> 8. What is the estimated cost of the study/demonstration project? Please include estimated Study, <br /> Planning, Engineering, and Construction costs, if known: <br /> A copy of the budget for the proposed project is attached. As you can see, it is a six year project. <br /> Beginning in 2007 and extending through 2012. Most of the costs will be incurred during the first <br /> two years of the project. This is due to the fact that the fen harvesting equipment, the transportation <br /> equipment, the receiver sites, and the fen harvesting will all be completed in the first two years. Then <br /> years three, four, five and six primarily involved monitoring of the relocated fen and the harvested <br /> area. The estimated total cost of the project is $964,864. <br />
The URL can be used to link to this page
Your browser does not support the video tag.