My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150309 Time Extention
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150309 Time Extention
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 11:59:12 AM
Creation date
8/18/2014 3:40:58 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-011
C150309
Contractor Name
Monte Vista, City of
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF MONTE VISTA <br /> 4.0"1144.t s 1 www.cityofmontevista.com <br /> min i::i:: <br /> MONTE VISTA 95 1st Ave lionte vista, CO 81144 <br /> Surrounded by Inspiration Main Phone: (719) 852-2692–TDD: (719) 852-4575 –Main Fax: (719)852-6167 <br /> July 15,2014 <br /> Mr. Kirk Russell, P.E. <br /> Colorado Water Conservation Board <br /> 1580 Logan Street, Suite 600 <br /> Denver, CO 80203 <br /> Re: Monte Vista Water Rights Acquisition for Augmentation,Contract No. C 150309 <br /> Request for Contract Amendment <br /> Dear Mr. Russell, <br /> Per Contract No. C 150309,the effective date of the Contract was September 23,2010. Within the <br /> Contract, in Appendix 1 to the Loan Contract, Section 10—Time for Performance,it is specified the <br /> Project Finish shall be"four(4)years from the Effective Date of this Contract." <br /> The City of Monte Vista has worked in a diligent fashion to pursue both the acquisition of water rights <br /> and the attainment of a long-term lease for water storage. The bulk of this activity took place through <br /> 2012 with the City attaining a significant amount of water rights and the storage required for that water <br /> per the Contract. Concurrent with this correspondence,the City is making Pay Request No.4,which will <br /> make the final installment on the water storage in Rio Grande Reservoir. <br /> In addition to the straightforward purchases of water made in conjunction with the Contract,the City has <br /> also pledged to purchase additional water rights. The current pledged amount totals over$237,000. <br /> These pledges to buy are based upon additional water rights available within the two major purchases <br /> from Lancaster and Sun Peak. However,the actual amount of water available within these rights cannot <br /> be known for certain until the Water Court has finally adjudicated the rights. <br /> Assuming the Water Court adjudicates the available water rights,this will leave the City with <br /> approximately$165,000 in remaining Loan Proceeds. The City has identified particular rights and <br /> additional storage necessary for our project. However, until the District Engineer has published the Final <br /> Rules for the Valley, we cannot be certain of the appropriateness of this potential purchase. The Final <br /> Rules must also be approved by the Water Court. <br /> All of this being said, it is very likely the final rules will be appealed and the Water Court process may <br /> take a number of years to have both the rules approved and our Augmentation Plan reviewed by the <br /> Court. The City of Monte Vista respectfully requests an Extension of Contract No. C150309 for a period <br /> of four(4)years from the current Time for Performance date. <br /> Sincerely, r'. <br /> Forrest H.Neuerburg <br /> City Manager <br /> 1 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.