My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finance Committee Meeting 2012
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
DayForward
>
1001-2000
>
Finance Committee Meeting 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2019 1:05:07 PM
Creation date
8/18/2014 3:21:57 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/26/2012
Description
Finance Sub-Comittee Meeting September 26, 2012
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
changes which are mandated by NOAA, the Federal Agency managing the GOES satellite <br /> resource. <br /> 411 <br /> 2. $55,000 for refurbishing existing stream gages as needed to maintain operational reliability <br /> of stream flow data collection. This is a recurring annual request to cover refurbishment <br /> and repair costs which arise due to deterioration of the physical stream gage infrastructure. <br /> The requested funding amount of$300,000 remains unchanged from the 2012-2013 <br /> appropriation and will be sufficient to maintain the operational viability of the system during <br /> 2013-2014. (Further details of the DWR Satellite Monitoring System funding request are <br /> explained in the attached memo from Scott Cuthbertson to Jennifer Gimbel dated August 1, <br /> 2012). <br /> Attachment <br /> • <br /> • <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.