My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153829 Misc Communications
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
C153829 Misc Communications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 1:34:21 PM
Creation date
8/18/2014 1:34:16 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153829
Contractor Name
Eagle Park Reservoir Company
Contract Type
Loan
Water District
37
County
Eagle
Bill Number
SB 96-153
Loan Projects - Doc Type
Default Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Metcalf Ditch 2nd Enlaraement The headgate;s located at a point on th. North bank of the ~agle <br />River whence the East witness comer of Section 7, Township 5 South, Range 81 West of th~ 6th <br />P.M. bears North 65Q31' East, 4,258.2 feet <br /> <br />Nottinoham and Puder Ditch Pump and Pipeline Enlaroement: The headgate is located at a point <br />on the North bank of the Eagle RiVer which bears South 120 West 250 feet from the South Quarter <br />Corner of Section 8, Township 5 South. Range 81 West of the 6th P.M. <br /> <br />Howard-Winslow Ditch and 1 s1 and 2nd Enlaroements: The headgate is located on the left banI< <br />of Berry Creek at a point whence the Northwest Corner of Section 4, Township 5 South, Range 82 <br />West of the 6th P.M. bears North 350 East. 2,740 feet. <br /> <br />June Creek Ditch and 1 st Enlaraement The headgate Is located on the left bank of June Creek at <br />a point whence the South Quarter Comer of Section 34, Township 4 South, Range 82 West of the <br />6th P.M. bears South 2t'12' West, 7,041.3 feet. <br /> <br />Howard Ditch and 1 st EnlarQement: The headgate is located on the right bank of the Eagle River <br />at a point 100 feet South of the Southeast Comer of Section 3, Township 5 South, Range 82 West <br />of the 6th P.M. <br /> <br />Brett Ditch and 2nd Enl.: The headgate is located on the West bank of Lake Creek at a point <br />3,600 feet above the mouth of Lake Creek near the center of the South line of the NE~SE~ of <br />Section 6. Township 5 South, Range 82 West of the 6th P.M. <br /> <br />J.M. Dodd Ditch. Hvde and Beck En!. and 2nd En!.: The headgate is located at a point South <br />43OJO' West, 2,050 feet from the East Quarter Comer of Section 7, Township 5 South, Range 82 <br />West of the 6th P ,M. <br /> <br />Creamery Ditch and 1 sf En!.: The headgate is located on the right bank of East lake Creek at a <br />point whence the Southwest Comer of Section 8, Township 5 South, Range 82 West of the 6th <br />P.M. bears North 3006' East, 3,576 feet. <br /> <br />Peterson Ditch: The headgate Is located on the North bank of the Eagle River at a point whence <br />the South Quarter Comer of Section 4, Township 5 South, Range 82 West of the 6th P.M. bears <br />South 85011' West a distance of 1,343.7 feet. <br /> <br />Dutton Ditch: The headgate Is located on the Northwest bank of Beny Creek at a point In the <br />SEXNE~ of Section 5, Township 5 South, Range 82 West of the 6th P.M. and near the <br />southwesterly line of the Denver & Rio Grande Railroad right-of-way. <br /> <br />~O'd <br /> <br />Wij ~9:11 I~3 8S-21-NOr <br />
The URL can be used to link to this page
Your browser does not support the video tag.