My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finance Committee Meeting 2009
CWCB
>
Board Meetings
>
DayForward
>
1001-2000
>
Finance Committee Meeting 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 1:33:12 PM
Creation date
8/18/2014 1:33:04 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/15/2009
Description
Finance Sub-Committee Meeting September 15, 2009
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Non-Reimbursable Application- CWCB Construction Fund <br /> Form Revised January 2009 <br /> • <br /> 5. Explain why you are requesting a grant, instead of a loan. (the Construction Fund exists primarily to <br /> provide low interest loans for the construction or rehabilitation of raw water projects. Non- <br /> reimbursable investments are approved only when the project or study is of statewide interest and <br /> benefits a wide range of people and organizations, and/or a large geographical area. <br /> The CWCB staff is requesting a non-reimbursable expenditure for Watershed Restoration because the <br /> program is 1) Staff initiated, 2)Endorsed by the Board, 3)Consistent with CWCB statutory <br /> responsibilities, and 4)Able to provide benefits for non-consumptive and consumptive water uses <br /> throughout the state. Presently the sources of state funding for these activities are not consistent and <br /> reliable. The funding will allow CWCB to cost-share with the federal government and other <br /> stakeholders to complete this much-needed work. <br /> • <br /> 6. List the names and addresses of any technical or legal consultants retained to represent the applicant or <br /> to conduct investigations for the proposed project or study. <br /> Name Address &Phone Number <br /> The CWCB has access to numerous qualified engineering consulting firms in Colorado <br /> through the As-Needed engineering program as well as standard contracting mechanisms. The <br /> CWCB has good working relationships with many qualified firms in addition to expertise <br /> provided by the Corps of Engineers, the NRCS, the USGS, and other study partners. Some of <br /> the work can also be completed in-house as well to further help leverage grant dollars. <br /> 7. List any feasibility study or scope of work that has been completed or is now in progress for the <br /> proposed project or study. (Submit one copy with this application): <br /> The CWCB has a number of completed watershed restoration master planning studies that <br /> have been very useful to a variety of users. Some of them have been used as a first step toward <br /> design and implementation of projects to address watershed restoration needs. Some examples <br /> include the Rio Grande Watershed Plan, the Eagle River Inventory and Assessment, Upper <br /> Yampa Implementation Plan, the Dolores River Dialogue, and the Mancos River Watershed <br /> Rapid Assessment. The CWCB also completed a watershed restoration master plan for the <br /> Alamosa River watershed. All of this information is available to the public via the Internet and <br /> CWCB's Imaging System. <br />
The URL can be used to link to this page
Your browser does not support the video tag.