My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finance Committee Meeting 2009
CWCB
>
Board Meetings
>
DayForward
>
1001-2000
>
Finance Committee Meeting 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 1:33:12 PM
Creation date
8/18/2014 1:33:04 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/15/2009
Description
Finance Sub-Committee Meeting September 15, 2009
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Project Construction Program—Project Data <br /> Applicant: Colorado Water Conservation Board <br /> • Project Name: ISF Engineering and Technical Project Type: Stream and Lake <br /> Support Services Protection Technical Services <br /> County: Statewide Drainage Basin: Water Source: N/A <br /> Statewide Drainage Basins <br /> Total Study Cost: $50,000 Funding Sources: CWCB <br /> CWCB Investment: Interest Rate: N/A Term: N/A <br /> $50,000 <br /> This project entails the continued implementation of a statewide engineering, technical, and <br /> support services program to help address consulting engineering and other technical service <br /> needs of the Colorado Water Conservation Board's Instream Flow and Natural Lake Level <br /> Program. <br /> The fund will be used to retain consultants, temporary employees and others on an as-needed <br /> basis to perform engineering, technical and data support services for the protection of the <br /> Board's decreed instream flow water rights, and for providing(1) technical and scientific bases <br /> for new appropriations, and (2) technical analyses related to the acquisition of water rights for <br /> • instream flow use. <br /> The CWCB relies upon sound technical investigations to appropriate, acquire, and protect <br /> instream flow water rights throughout the state. Due to a steady increase in water court matters, <br /> the workload for the CWCB staff responsible for the protection of the CWCB's existing instream <br /> flow water rights continues to grow. For example, resume review activities, including injury <br /> analyses that provide justification for filing of Statements of Opposition, requires significant <br /> staff resources. In addition, technical investigations are needed to process the acquisition of <br /> senior water rights and to provide technical support and expertise to change the decreed uses of <br /> the acquired water to instream flow use. <br /> Likewise, engineering support services may be needed to augment staff water availability <br /> analyses for streams on which the Board is considering appropriating new instream flow water <br /> rights. This includes determination of the amount of water that is physically available for the <br /> Board's appropriation by analyzing available gage records, diversion records and call records, <br /> using available stream flow models, and developing stream flow models or utilizing appropriate <br /> standard methods to develop hydrographs to predict the natural (virgin) streamflows for each <br /> stream under consideration. <br /> The fund will also be used to continue to hire temporary employees to assist with summer field <br /> investigations of new ISF recommendations, installation of pressure transducers and other <br /> temporary stream gages, maintenance of web based mapping applications to provide the public <br /> • with information on the location of proposed ISF recommendations, and other technical services <br /> that support the appropriation, acquisition, and physical and legal protection of ISF water rights. <br />
The URL can be used to link to this page
Your browser does not support the video tag.