My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finance Committee Meeting 2009
CWCB
>
Board Meetings
>
DayForward
>
1001-2000
>
Finance Committee Meeting 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 1:33:12 PM
Creation date
8/18/2014 1:33:04 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/15/2009
Description
Finance Sub-Committee Meeting September 15, 2009
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Memorandum to CWCB Page 4 <br /> High Data Rate DCP Upgrade Program. Of the funds allocated, $245,000 was expended on the <br /> procurement and installation of new generation, high data rate, satellite-linked monitoring equipment. The <br /> high data rate upgrade program began in 2001. To date, over 400 DWR satellite monitoring gages • <br /> throughout Colorado have been upgraded from 100 baud to 300 baud transmission speed. Upgrades also <br /> include new generation data collection platforms with on-board data logging, new stage measurement <br /> equipment, ancillary telemetry support equipment, and gage station grounding equipment. DWR anticipates <br /> being able to complete this initial phase of the high data rate DCP upgrade program by the end of FY2010- <br /> 11. As discussed above, additional upgrades will be required to meet the band with limitations placed on the <br /> system. <br /> Streamgage Refurbishment. Of the FY08-09 funds, $55,000 along with carryover funds from the previous <br /> fiscal year were used on refurbishment of existing stream gages throughout the State. Refurbishment <br /> projects were completed at the following stream gages in FY 2008-09. <br /> Boulder Creek near Orodell $84.48 <br /> South Platte River near Balzac $215.10 <br /> Huerfano R near Redwing $4,750.00 <br /> Arkansas River at Nepesta Bridge near Nepesta $215.10 <br /> Arkansas River at Salida $110.85 <br /> Crooked Arroyo $600.00 <br /> Horse Creek at Hwy 194 $250.00 <br /> North Clear Creek bel Continental Reservoir $7,306.71 <br /> Goose Creekat Wagonwheel Gap $1,620.71 <br /> Railings on wooden A-frame platforms--Div 3 $696.71 <br /> Big and Little Spring Creeks $891.96 <br /> Roubideau Creek at the Mouth near Delta $2,688.00 <br /> Uncompahgre River at Olathe $5,460.00 <br /> Cow Creek near Ridgway Reservoir $2,846.35 <br /> Muddy Creek bel Paonia Reservoir $870.98 <br /> Walton Creek near Steamboat Springs $1,996.17 <br /> Morrison Creek bel Silver Creek near Stagecoach $1,525.66 <br /> LAPBRECO ramp flume stabilization $7,480.00 <br /> LAPCHECO ramp flume stabilization $7,120.00 <br /> La Plata at Hesperus $8,960.00 • <br /> New door handsets and locks all keyed alike-Div 7 $812.90 <br /> La Plata River Ditch gages(3) $662.06 <br /> Flood Hardening. An allocation of$50,000 was used to flood harden several critical stream gaging sites. <br /> The following table is a summary of the flood hardening projects initiated or completed in FY08-09. <br /> South Boulder Creek at Eldorado Springs $4,522.00 <br /> St.Vrain Creek at Lyons $5,848.82 <br /> Arkansas R.at Canon City $7,985.57 <br /> Arkansas R.at Granite $2,500.03 <br /> Arkansas R.near Granada $3,587.88 <br /> Cucharas River at Boyd Ranch $7,250.00 <br /> Huerfano River at Redwing $4,522.00 <br /> San Antonio River at Ortiz $17.76 <br /> Conejos River below Platoro Reservoir $2,611.19 <br /> Trinchera Creek above Turner's Ranch _ $178.01 <br /> Big Thompson River at the Canyon Mouth $4,522.00 <br /> SP-ADCP transducer wit 3 m cable $6,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.