My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finance Committee Meeting 2008
CWCB
>
Board Meetings
>
DayForward
>
1001-2000
>
Finance Committee Meeting 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2015 3:48:30 PM
Creation date
8/18/2014 10:35:36 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/16/2008
Description
Finance Sub-Committee Meeting September 16, 2008
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br /> Water Project Construction Program—Project Data <br /> Applicant: Division of Water Resources and Colorado Water Conservation Board <br /> • Project Name: Satellite-linked Monitoring Project Type: DWR Stream Gaging <br /> System and Flood Hardening Program <br /> County: Statewide Drainage Basin: Water Source: N/A <br /> Statewide Drainage Basins <br /> Total Study Cost: $350,000 Funding Sources: CWCB <br /> CWCB Investment: Interest Rate: N/A Term: N/A <br /> $350,000 <br /> This project entails the continued, long-term operational viability of the State Satellite Linked <br /> Monitoring System, which is administered by the Division of Water Resources (DWR). It also <br /> M g Y � Y � ) <br /> involves the continued implementation of the joint DWR/CWCB Flood Hardening Program. <br /> The Satellite-linked monitoring system, which is comprised of over 450 satellite-gaging stations, <br /> requires continued renovation and flood hardening of existing gages, replacement of outdated <br /> data collection platforms and upgrades to transmission components. In addition, many existing <br /> gaging stations need to be modified to provide critical stream flow data for flood warning and <br /> low flow monitoring. Changes in <br /> " technology, which will ultimately <br /> `� increase reliability and real time data <br /> • transmission rates will require the <br /> DWR to continue to upgrade the system <br /> in the future. The costs associated with <br /> the continued refurbishment and <br /> operational viability of the system is <br /> approximately $300,000 per year. The <br /> associated flood hardening cost are <br /> $50,000 per year. <br /> Crystal River DWR/CWCB Satellite Gage <br /> Ilk <br />
The URL can be used to link to this page
Your browser does not support the video tag.