My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150390 Project Summary
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150390 Project Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2017 10:34:45 AM
Creation date
8/18/2014 10:24:16 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150390
CT2017-3944
Contractor Name
Culver Lateral Ditch Company
Contract Type
Loan
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Culver Lateral Ditch Company <br /> Emergency Culver Mahoney Ditch Repair <br /> 150390 <br /> - - <br /> t p- ,..^1 r � r . �,yr ' <br /> ,. !� i 1 _ , <br /> y' <br /> e, <br /> T 6 <br /> ,,,,r_ q,,. <br /> end'. <br /> F <br /> A <br /> 1 <br /> Project Description <br /> During the unprecedented flood of September 2013 in the tributaries to the South Platte River, a <br /> significant number of diversion structures and dams along the river corridor were damaged including the <br /> Culver Lateral Ditch Company ditch and diversion structure. The flood damaged the diversion dam, <br /> headgate structure, sand gates, measurement flume, and recording structure. Additionally, the first <br /> 1,500 feet of ditch was destroyed as it effectively became a part of the Little Thompson River. The next <br /> 1,800 feet of ditch was filled with sediment. The purpose of the Project is to repair the diversion <br /> structure and ditch to allow the Company to divert its decreed water rights. <br /> Project Data <br /> Sponsor: Culver Lateral Ditch Company County: Water Source: Little Thompson River <br /> Boulder/Larimer <br /> Terms of Loan: $151,000 for 30 years®2.30% Construction Completed: May 2014 <br /> Expended Amount: $151,000 <br /> Anticipates FEMA Funding: YES <br /> Design Engineer: TZA Water Engineers, Inc. - Lakewood, Colorado <br /> Contractor: Chaparral Construction, LLC - LaVeta, Colorado <br /> Project Elements: The project included removal of debris and silt from the ditch and diversion dam, <br /> reshaping the ditch sideslopes and flowline, and rehabilitation of the headgate structure, sand gates, <br /> measurement flume, and recording structure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.