My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150376 Project Summary
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150376 Project Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2014 11:00:34 AM
Creation date
8/18/2014 10:20:40 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150376
Contractor Name
Ish Reservoir Company
Contract Type
Loan
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ish Reservoir Company <br /> Emergency Inlet Ditch and Diversion Structure Repair <br /> C150376 <br /> ;;11..1 3:4 ligrfa' <br /> at" ltt" 11111 <br /> Project Description <br /> During the unprecedented flood of September 2013 in the tributaries to the South Platte River, a <br /> significant number of diversion structures and dams along the river corridor were damaged. The purpose <br /> of this Project is to repair the Little Thompson River diversion structure and the Ish Reservoir inlet ditch <br /> structure to allow the Company to deliver water to shareholders. <br /> Project Data <br /> Sponsor: Ish Reservoir Company County: Boulder& Water Source: Little Thompson River <br /> Larimer <br /> Terms of Loan: $207,050 for 30 years® 1.75% Construction Completed: April 2014 <br /> Expended Amount: $207,050 <br /> Anticipates FEMA Funding: NO <br /> Design Engineer: Tessara Water, LLC - Hudson, Colorado and SM&RC Structural Engineers, Inc. - Lakewood, <br /> Colorado <br /> Contractors: Concrete Structures, Inc. - Longmont, CO. & Zac Dirt, Inc. - Longmont, CO. <br /> Project Elements: The Project included the repair of the Little Thompson River diversion structure and <br /> the Ish Reservoir Inlet Ditch: The scope of work for the diversion structure repairs involved removing <br /> debris from the dam and diversion structure, forming and pouring a new wing wall on the north side of <br /> the diversion dam, and then rechanneling the Little Thompson River to flow back over the diversion dam. <br /> The scope of work for the inlet ditch washout repairs involved creating a new path for the Company's <br /> ditch through the area. This involved creating a foundation secured to bedrock and building a new water <br /> conveyance system on top of the foundation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.