My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Construction Fund and Severance Tax Trust Fund Annual Report 1999
CWCB
>
Publications
>
DayForward
>
CWCB Construction Fund and Severance Tax Trust Fund Annual Report 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 11:46:06 AM
Creation date
8/15/2014 9:56:14 AM
Metadata
Fields
Template:
Publications
Year
1999
Title
Construction Fund and Severance Fund Tax Trust Fund Annual Report
CWCB Section
Agency-wide
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br /> ' LEFT HAND DITCH CO.—LEFT HAND VALLEY RES. SPILLWAY/OUTLET REHAB. <br /> 3 <br /> ` I_ -- <br /> 005P - <br /> The Concrete Stilling Basin and Outlet Pipe at the Bottom of the RCC Spillway <br /> Project Description <br /> ' This project is the result of the State Engineer's order to increase the spillway capacity of <br /> the Left Hand Valley Reservoir in order to comply with dam safety rules and regulations regarding <br /> downstream structures. The project includes the replacement of the current spillway with a larger <br /> roller compacted concrete (RCC) spillway and concrete stilling basin. Rocky Mountain <br /> Consultants of Longmont, CO completed the permitting process, design engineering and <br /> preparation of construction contract documents. The construction contract was awarded to Gears, <br /> ' Inc. of Crested Butte, CO., commenced September 1, 1998 and was completed in January 1999. <br /> Project Data <br /> Sponsor: Left Hand Ditch Company, Inc. County: Boulder River: Left Hand Creek <br /> Terms of Loan: $560,000.00 @ 4.0% for 30 yrs. Substantial Completion Date: Jan. 13, 1999 <br /> Design Engineer: Rocky Mountain Consultants, Inc. —Longmont, Colorado <br /> ' Construction Contractor: Gears, Inc. —Crested Butte, Colorado <br /> Design Criteria: Dam Height=51.25 ft. Dam Crest Elev. = 5,359.5 ft. <br /> Spillway Crest Elev. = 5,351.5 ft. Reservoir Capacity=2,814 ac.ft. <br /> Spillway Type=Stepped Roller Compacted Concrete <br /> Annual Volume of Water Delivered by the Project: 1,624 ac.ft. <br /> 1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.