My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Construction Fund and Severance Tax Trust Fund Annual Report 1999
CWCB
>
Publications
>
DayForward
>
CWCB Construction Fund and Severance Tax Trust Fund Annual Report 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 11:46:06 AM
Creation date
8/15/2014 9:56:14 AM
Metadata
Fields
Template:
Publications
Year
1999
Title
Construction Fund and Severance Fund Tax Trust Fund Annual Report
CWCB Section
Agency-wide
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br /> CHIPPERFIELD LANE DITCH,INC.—CHPPRFLD LANE DITCH REHABILITATION <br /> • <br /> Looking toward the Multa Trina Ditch at the New 4-bay Concrete Division Box <br /> g Y <br /> Project Description <br /> This $55,000 project from the 1998 Small Project Loan Account is the construction of <br /> ' 10,000 feet of pipeline replacing an existing open ditch in poor condition. The project also <br /> consisted of re-construction of the existing headgate structure and a new division box at the Multa <br /> Trina Ditch. The Glenwood Springs office of the Natural Resources Conservation Service prepared <br /> ' the project design. Project construction commenced November 1, 1997 by the Ditch Company's <br /> own forces. The project was completed in May 1998 with substantial completion on June 1, 1998. <br /> ' Project Data <br /> Sponsor: Chipperfield Lane Ditch, Inc. County: Garfield River: Dry Hollow Creek <br /> Terms of Loan: $41,011.94 @ 3.75% for 30 yrs. Substantial Completion Date: June 1, 1998 <br /> ' Design Engineer: Natural Resources Conservation Service—Glenwood Springs Office <br /> ' Construction Contractor: Chipperfield Lane Ditch, Inc. Members <br /> Design Criteria: 10,000 lineal feet—8 inch diameter PVC pipe <br /> II -8 ft x 12 ft x 4 ft 4-bay Concrete Division Box <br /> Annual Volume of Water Delivered by the Project: 220 ac.ft. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.