Laserfiche WebLink
I <br /> I <br /> 5.0 Studies and Investigations 29 <br /> 5.1 Rio Grande Decision Support System Data Collection & Design Continuation29 <br /> 5.2 Satellite Monitoring System Maintenance Continuation 30 <br /> 5.3 Arkansas River Multi-Objective Management Plan Continuation 30 <br /> 5.4 Imaging System for the Construction Fund Project Records 30 <br /> 5.5 South Platte River Decision Support System Feasibility Study 30 <br /> 5.6 Rio Grande Headwaters Restoration Project 31 <br /> 5.7 Arkansas River Basin Water and Storage Needs Assessment—Phase 2 31 <br /> 5.8 Cherry Creek Reservoir Flood Safety Investigation 31 <br /> 5.9 Change in Statutes 31 <br /> I <br /> Appendix A- Completed Project Loans <br /> Appendix B - Data for Loan Projects Completed in FY98-99 <br /> Appendix C - Data for SB 99-173 Authorized Loan Projects 1 <br /> Appendix D - List of De-Authorized Loan Projects <br /> Appendix E - List of Completed Feasibility Studies <br /> I <br /> I <br /> I <br /> 1 <br /> 1 <br /> 1 <br /> I <br /> CWCB FY99 Annual Report,page 2 <br /> I <br />