I
<br /> Iiiiiiiiiiiiiiiii iiiiiiiiiiiiiii i iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiIiiiiiiiiiiiiiiiiiii iiiiiiiiiiiiiiiiiiiiiiIiiiiiiiiiiiiifiiiiiiiiiiiiii.il:!:1::::iiiii:iiiiiiiiiiiiiiiiii:ii::i:iiiiii:::::::iiii i iiiiiii:i:::iiiiigiiiiiiiiiIiiiiiii;:iiiiiiiiiiiiiiil:iiiiiliiiiiiiiiiiiiiiiiiii:iiiiiiiiiiiiiiiiiiriiii:iiiii:iii iii::i iiiiiiii iiiiiiiiiiiiiiiiiiiiiiiir:::::iiiiiiii:iii;: t#1t#f+....
<br /> I Lookout Mountain Water District
<br /> City of Greeley Upper Beaver Brook No.3A Res.Enlarg. Clear Creek 1 600,000 07/18/92
<br /> Barnes Meadow Dam Spillway&Repairs Larimer 1 313,424 09/18/92
<br /> Colorado Water Conservation Board Union Avenue Boat Chute Arapahoe 1 1,328,000 05/21/93 _
<br /> I Sanchez Ditch and Reservoir Co. Sanchez Dam Repairs,Phase 1 Costilla 3 200,000 07/01/93
<br /> Clinton Ditch&Reservoir Company Clinton Reservoir(Municipal Portion) Summit 5 615,000 08/13/93
<br /> Clinton Ditch&Reservoir Company Clinton Reservoir-(Ski Area Note) Summit 5 4,120,000 08/13/93
<br /> Conejos Water Conservancy District Platoro Reservoir Purchase Conejos 3 450,000 10/01/93
<br /> I Sedgewick Sands Draw WCD Phase II&Ill Flood Control Project Sedgwick 1 130,027 11/01/93
<br /> Elmwood Lateral Ditch Company Elmwood Lateral Ditch Rehabilitation Mesa 5 80,000 09/01/94
<br /> Trinchera Irrigation Company Mountain Home Reservoir Rehabilitation Costilla 3 611,478 09/15/94
<br /> I Summit Reservoir and Ditch Co. Summit Reservoir Dam and Ditch Repair Montezuma 7 33,000 11/01/94
<br /> Windsor Reservoir and Canal Co. Poudre Valley Canal Slide Repair Larimer 1 300,000 12/01/94
<br /> Town of Rangely Rangely Raw Water Intake Rehab. Rio Blanco 6 34,000 01/10/95
<br /> Town of Monument Monument Well No.2 Replacement El Paso 2 94,000 02/01/95
<br /> I Terrace Irrigation Company Alamosa Creek Canals and Laterals
<br /> Erie Flood Control Levee Conejos 3 1,650,000 04/15/95
<br /> Town of Erie Weld 1 498,512 05/01/95
<br /> New Cache La Poudre Irrig.Co. Diversion Structure Replacement Larimer 1 450,000 05/01/95
<br /> Loloff Lateral Ditch Company Loloff Lateral Ditch Replacement Weld 1 71,500 05/01/95
<br /> INorth Poudre Irrigation Company North Poudre Res.5&6 Rehabilitation Larimer 1 1,761,096 06/01/95
<br /> Hay-Bretherton Ditch Company Lower Hay-Bretherton Ditch Lining Rio Blanco 6 20,000 06/01/95
<br /> Castle Pines North Metro District Well A-3 Rehabilitation Douglas 2 100,500 06/30/95
<br /> I Kings Row Homeowners Association Irrigation System Improvements Eagle/Garf. 5 75,000 09/01/95
<br /> Military Park Reservoir Company Military Park Reservoir Dam Rehab. Delta 4 29,515 10/15/95
<br /> Lloyd Ranch Limited Partnership Rapid Creek Dams No. 1 &2 Rehab. Mesa 5 100,000 11/01/95
<br /> Ute Water Conservancy District Colorado River Pumping Station Mesa 5 400,000 11/01/95
<br /> I Caryl Carroll DD&E Wise Dam Rehabilitation Rio Blanco 6 50,000 11/01/95
<br /> Town of Silt Raw;Water lnigation System Garfield 5 400,000 11/01/95
<br /> Divide Canal and Reservoir Company Wdrster Dam Rehabilitation Larimer 1 665,000 06/15/96
<br /> I Appleton ML 350 Ditch Co., Inc. Ditch Rehabilitation Mesa 5 53,000 06/18/96
<br /> Town of Erie NCWCD Southern Pipeline&Conn. Weld 1 1,544,000 06/01/96
<br /> Rainbow Park Water Company Rainbow Park Ditch Rehabilitation Fremont 2 64,919 06/01/96
<br /> South Platte Ditch Company Diversion Structure Rehabilitation Logan 1 100,000 06/01/96
<br /> I Colo.River Water Conservation Dist. Wolford Mountain Reservoir Grand 5 16,256,000 06/01/96
<br /> Morgan County Quality Water District Hay Gulch Well Field Purchase Weld 1 3,000,000 07/09/96
<br /> City of Greeley Peterson Lake Dam Rehabilitation Larimer 1 644,236 09/01/96
<br /> Tremont Mutual Ditch Company Diversion Structure Rehabilitation Morgan_ 45,000 09/01/96
<br /> I Lower Arkansas Water Mgt.Assoc. Well Augmentation Feasibility Study Prowers 2 65,000 10/24/96
<br /> Castle Pines North Metro District Rehabilitate Three 2,200 foot Wells Douglas 1 255,804 12/01/96
<br /> City of Fort Lupton NCWCD Southern Pipeline Weld 1 4,233,000 01/01/97
<br /> I City of Greeley Hourglass Reservoir Rehabilitation Larimer 1 206,351 01/01/97
<br /> Town of Hudson NCWCD Southern Pipeline Weld 1 1,273,000 01/01/97
<br /> City of Ft.Morgan NCWCD Southern Pipeline Weld 1 5,500,000 01/01/97
<br /> Town of Norwood Norwood Raw Water Reservoir San Miguel 4 950,000 01/01/97
<br /> I West Divide Water Cons.District Alsbury Dam Rehabilitation Mesa 5
<br /> Lo 70,000 01/01/97
<br /> Bravo Ditch Compan Diversion Structure Rehabilitation an 1 39,099 03/01/97
<br /> Consolidated Extension Canal Co. Purgatoire River Siphon Rehabilitation Bent 2 229,431 03/10/97
<br /> Orchard Mesa Irrigation District Mutual.Mesa Ditch Lateral Rehab. Mesa 5 861,827 05/01/97
<br /> I Vouga Reservoir Association Vouga Reservoir Dam Rehabilitation Saguache 4 600,000 05/08/97
<br /> Lower Arkansas Water Mgt.Assoc. X-Y Ranch and Water/Manuel Shares Prowers 2 3,688,368 05/28/97
<br /> Julesburg Irrigation District Julesburg Res.Dam No.4 Rehab. Sedgwick 1 325,000 06/01/97
<br /> I Town of Ignacio Ignacio Outside Irrigation System La Plata 7 180,000 06/01/97
<br /> Beaver Park Water Company Brush Hollow Dam Rehabilitation Fremont 2 975,000 06/30/97
<br /> Upper Yampa Water Cons.District Stagecoach Reservoir Refinance Routt 6 2,000,000 07/30/97
<br /> River Oaks on the Roaring Fork POA Raw Water Irrigation System Eagle 5 16,000 08/15/97
<br /> I Excelsior Irrigating Company Diversion Structure Rehabilitation Pueblo 2 100,000 08/21/97
<br /> Sanchez Ditch and Reservoir Co. Sanchez Dam Outlet Tower Rehab. Costilla 3 335,000 09/03/97
<br /> Mancos Water Conservancy District Jackson Gulch Res.Inlet Canal Rehab. Montezuma 7 62,500 09/09/97
<br /> Town of Lyons Intake Structure Rehabilitation Boulder 1 226,980 09/09/97
<br /> I
<br />
|