Laserfiche WebLink
4.6 Completed Construction Project Loans <br /> The CWCB Construction Fund was established by the General Assembly in 1971 to provide low , <br /> interest, long-term loans to water users for the development of water projects. The first project was <br /> completed in 1977. By the end.of.FY98, the fund provided over$122.9 million in loan financing <br /> for 172 water projects. A list of the completed projects financed through loans from the <br /> Construction Fund is shown in Appendix A. <br /> Thirteen CWCB Construction Fund loans representing over $4.2 million, as shown in the <br /> following table,were completed in FY 98. Additional details about these completed project loans <br /> are located in Appendix B. I <br /> I <br /> Colorado Water Conservation Board I <br /> Historic Loans from the Construction Fund, 1971-1998 i <br /> $1.48(1.2%)Reservoir Enlargements <br /> $23.47(19.1%)Dam Rehabilitation <br /> $26.61(21.6%)New Reservoirs <br /> 1 <br /> $19.98(16.2%)Res.&Water Purchases $29.43(23.9%)Infrastructure <br /> 1 <br /> $22.03(17.9%)Domestic Systems(1971-1981) <br /> I <br /> I <br /> 1 <br /> CWCB FY98 Annual Report,page 28 <br />