Laserfiche WebLink
I <br /> 2.5 Small Project Loan Account ' <br /> In 1994 through SB94-029, the General Assembly created the Small Project Loan Account. A <br /> 111 <br /> total of$2.0 million was set aside for loans of$100,000 or less. The CWCB was empowered to <br /> authorize these loans at any time during the year without waiting to submit these projects for General I <br /> Assembly approval during the legislative session. <br /> The Board approved 5 Small Project Account loans in FY 96, 5 Small Projects Account loans <br /> I <br /> in FY 97, 4 Small Project Account loans in FY 98, and 1 thus far in FY 99 totaling $1,000,700. <br /> However,the total amount actually under contract was less,or$929,000 as listed below. A balance <br /> of$631,304 was reported by COFRS to be in the account on June 30, 1998. <br /> 1 <br /> TABLE 4 1 <br /> Loans Approved by the CWCB from the <br /> Small Project Loan Account <br /> I <br /> Meeting Approved Contract <br /> IApproved Borrower/Emergency County Amount Amount <br /> Jul 1995 Caryl R.Carroll- Rio Blanco $25,000 $ 25,000 <br /> D&D Wise Dam Rehab.(Additional) <br /> I <br /> Jan 1996 The Pagosa Springs Pipeline Co.- Archuleta 60,000 0 <br /> Raw Geothermal Water Pipeline <br /> Jan 1996 South Platte Ditch Company- Logan 100,000 100,000 <br /> Diversion Structure Rehabilitation <br /> Mar 1996 Bravo Ditch Company- Logan 51,700 40,000 I <br /> Diversion Structure Rehabilitation <br /> May 1996 Tremont Mutual Ditch Company- Morgan 45,000 45,000 I <br /> Diversion Structure Rehabilitation <br /> Sep 1996 Decker Lateral Company- Weld 100,000 100,000 1 <br /> Decker Lateral Lining Project <br /> Nov 1996 Excelsior Irrigating Company- Pueblo 100,000 100,000 <br /> Ditch Rehabilitation <br /> Mar 1997 Cotton Creek Water Company- Saguache 100,000 100,000 <br /> I <br /> Airline Ditch Rehabilitation <br /> Mar 1997 Farmers Independent Ditch- Weld 55,000 55,000 <br /> IDitch Rehabilitation <br /> May 1997 Chipperfield Lane Ditch- Garfield 60,000 60,000 <br /> Rehab Headgate and Pipeline I <br /> CWCB FY98 Annual Report,page 10 1 <br />