My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Annual Report December 1995
CWCB
>
Publications
>
DayForward
>
CWCB Annual Report December 1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 11:45:13 AM
Creation date
8/14/2014 3:44:35 PM
Metadata
Fields
Template:
Publications
Year
1995
Title
Annual Report to the 60th Colorado General Assembly Second Regular Session
CWCB Section
Agency-wide
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2.0 Construction Fund <br /> ' 2.1 Fund Equity <br /> Fund equity includes the sum of all outstanding project loans and the cash balance in the fund <br /> which has been invested by the State Treasurer. The total fund equity reported by the Colorado <br /> 1 Financial Reporting System (COFRS) was $174.0 million on June 30, 1995, the end of FY 94-95. <br /> This included approximately $73.6 million in outstanding loan principal receivable from <br /> 1 borrowers with completed projects, $26.6 million in cash funds reserved for projects authorized <br /> by the Legislature which are under contract or under construction, $74.2 million in cash funds <br /> reserved in special accounts or for future projects authorized by the Legislature, and no <br /> unreserved cash. The total "cash balance" on June 30, 1995, was $100.8 million. <br /> I <br /> TABLE 1 <br /> Colorado Water Conservation Board <br /> Financial Statements FY 94-95 <br /> 1 <br /> Fund Equity Actual <br /> June Actual Actual <br /> une 30.1993 June 30.1994 June 30.1995 <br /> Outstanding Loans Receivable $52,201,070 62,864,672 73,642,953 <br /> Reserved for Authorized Projects-Under Contract 29,919,132 31,401,070 <br /> Reserved for Authorized Projects-Not Under Contract 52,274,347 51,140,622 74,215,404 <br /> Unreserved Cash or 'Working Balance" 2,860,600 61,869 26,587,562 <br /> (490,674) <br /> Total Fund Equity on June 30 $137,255,149 $145,468,233 $173,955,245 <br /> I <br /> CWCB Annual Report, page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.