My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Annual Report December 1995
CWCB
>
Publications
>
DayForward
>
CWCB Annual Report December 1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 11:45:13 AM
Creation date
8/14/2014 3:44:35 PM
Metadata
Fields
Template:
Publications
Year
1995
Title
Annual Report to the 60th Colorado General Assembly Second Regular Session
CWCB Section
Agency-wide
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RANGELY WATER INTAKE STRUCTURE REPLACEMENT <br /> 1 <br /> !- <br /> 1 <br /> 1 <br /> The Rangely Raw Water Intake Pump House looking north toward the White River <br /> Project Description <br /> ' This Emergency Infrastructure Repair Loan was necessitated by the imminent failure of <br /> the Town of Rangely's raw water intake structure on the White River. <br /> ' Included in the project was the re-construction of the raw water intake structure and the <br /> construction of a pump house sheltering two new 2,500 gpm pumps. Raw water from the site <br /> is pumped from the Intake Structure to the Rangely water treatment plant approximately 1/4 mile <br /> away. <br /> Project Data <br /> Sponsor: Town of Rangely County: Rio Blanco River: White River <br /> Terms of Loan: $34,000 @ 4.5% for 2 years <br /> Annual Payment: $18,156 <br /> Design Engineer: Schmueser, Gordon & Meyer - Glenwood Springs, Colorado <br /> Contractor: Town of Rangely - General Contractor <br /> Building, Mechanical and Electrical Sub-Contractors <br /> ' Design Criteria: <br /> 1 - 20'x 26' metal building 2 - 2,500 gpm self priming centrifugal Pumps <br /> Associated pipes, fittings and appurtenances <br /> All electrical conduits, fixtures and accessories. <br /> Annual Volume of Water Delivered by Project: 0.5 MGD = 560 acre feet <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.