My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Annual Report December 1995
CWCB
>
Publications
>
DayForward
>
CWCB Annual Report December 1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 11:45:13 AM
Creation date
8/14/2014 3:44:35 PM
Metadata
Fields
Template:
Publications
Year
1995
Title
Annual Report to the 60th Colorado General Assembly Second Regular Session
CWCB Section
Agency-wide
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br /> IAmount Date <br /> Project Name Sponsor County Div Loaned Completed <br /> I Union Avenue Boat Chute Colorado Water Conservation Board Arapahoe 1 1,328,000 05/21/93 _ <br /> Sanchez Dam Repairs, Phase 1 Sanchez Ditch and Reservoir Co. Costilla 3 200,000 07/01/93 <br /> Clinton Reservoir(Municipal Portion) Clinton Ditch&Reservoir Company Summit 5 615,000 08/13/93 <br /> Clinton Reservoir(Ski Area Note) Clinton Ditch&Reservoir Company Summit 5 4,120,000 08/13/93 <br /> I Platoro Reservoir Purchase Conejos Water Conservancy District Conejos 3 450,000 10/01/93 <br /> Phase II&Ill Flood Control Project Sedgewick Sands Draw WCD Sedgwick 1 130,027 11/01/93 <br /> Elmwood Lateral Ditch Rehabilitation Elmwood Lateral Ditch Company Mesa 5 80,000 09/01/94 <br /> I Mountain Home Reservoir Rehabilitation Trinchera Irrigation Company Costilla 3 1,000,000 09/15%94 <br /> Summit Reservoir Dam and Ditch Repair Summit Reservoir and Ditch Co. Montezuma 7 33,000 11/01/94 <br /> Poudre Valley Canal Slide Repair Windsor Reservoir and Canal Co. Larimer 1 300,000 12/01/94 <br /> Rangely Raw Water Intake Rehab. Town of Rangely Rio Blanco 6 34,000 01/10/95 <br /> I Monument Well No.2 Replacement Town of Monument El Paso 2 100,000 02/01/95 _ <br /> Alamosa Creek'Canals and Laterals Terrace Irrigation Company Conejos 3 1,650,000 04/15/95 <br /> Erie Flood Control Levee Town of Erie Weld 1 498,512 05/01/95 <br /> IDiversion Structure Replacement New Cache La Poudre Irrig.Co. Larimer 1 700,000 05/01/95 <br /> Loloff Lateral Ditch Replacement Loloff Lateral Ditch Company Weld 1 71,500 05/01/95 <br /> North Poudre Res.5&6 Rehabilitation North Poudre Irrigation Company Larimer 1 1,800,000 06/01/95 <br /> Lower Hay-Bretherton Ditch Lining Hay-Bretherton Ditch Company Rio Blanco 6 20,000 .06/01/95 <br /> IWell A-3 Rehabilitation Castle Pines North Metro District Douglas 2 100,500 06/30/95 <br /> II TOTAL I 125 Projects I I I $76,568,328 I I <br /> I <br /> I <br /> I <br /> • <br /> I <br /> I , <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.