My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Annual Report December 1995
CWCB
>
Publications
>
DayForward
>
CWCB Annual Report December 1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 11:45:13 AM
Creation date
8/14/2014 3:44:35 PM
Metadata
Fields
Template:
Publications
Year
1995
Title
Annual Report to the 60th Colorado General Assembly Second Regular Session
CWCB Section
Agency-wide
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3.7 Recommended Changes to Previous Authorizations i <br /> Morgan County Quality Water District ' <br /> The Morgan County Quality Water District was authorized in HB95-1155 a loan in the amount <br /> of$4,126,000 for participation in the Northern Colorado Water Conservancy District's Southern <br /> Water Supply Pipeline on the condition that their feasibility study be completed. Following a <br /> detailed analysis of alternatives, the project was changed to the purchase of the Hay Gulch well <br /> field with a CWCB loan in the amount of$3,000,000. Recent negotiations with the owners of <br /> the well field were more favorable than in the past. <br /> 1 <br /> Windsor Reservoir and Canal Company <br /> The amount of the loan to the Windsor Reservoir and Canal Company authorized in HB95- <br /> 1155 is recommended to be increased by $702,000 for a total appropriation of$1,202,000. As <br /> a result of the feasibility study made as condition of the original $500,000 appropriation, the ' <br /> company developed a 15-year staged improvement plan for its canals and six reservoirs. This first <br /> phase of the project will save losses in a section of the Poudre Valley Canal and the Cobb Lake <br /> Pipeline. , <br /> South Platte River Urban Corridor Project I <br /> The Board recommends approximately $716,000 in residual grant funds originally authorized <br /> in 1979 and amended in 1990 for construction of the Chatfield Project Channel Improvement, <br /> Reaches I and II, be reallocated as a grant towards state participation in the restoration of the <br /> South Platte River cannel through the City of Denver. ' <br /> 1 <br /> 1 <br /> I <br /> 1 <br /> I <br /> CWCB Annual Report, page 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.