My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Annual Report December 1995
CWCB
>
Publications
>
DayForward
>
CWCB Annual Report December 1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 11:45:13 AM
Creation date
8/14/2014 3:44:35 PM
Metadata
Fields
Template:
Publications
Year
1995
Title
Annual Report to the 60th Colorado General Assembly Second Regular Session
CWCB Section
Agency-wide
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br /> I 2.6 Mitigation Account <br /> In 1987, HB 87-1158 created the "Fish and Wildlife Resources Account," also known as the <br /> Mitigation Account, in the Construction Fund. Non-reimbursable expenditures totaling <br /> I $1,400,000 have been made from the Mitigation Account for mitigation plans approved by the <br /> Division of Wildlife. These disbursements are listed below. The balance in the account was <br /> $5,799,580 on June 30, 1995. <br /> I1989 Stagecoach Reservoir • $ 400,000 <br /> 1990 Wolford Mountain Reservoir • 1,000,000 <br /> 1 <br /> 2.7 Emergency Infrastructure Repair Account <br /> I <br /> In 1993 through HB 93-1273 the Legislature authorized the Board to set aside $2.0 million <br /> I of Construction Fund money in an account reserved for emergency repair of water resources <br /> infrastructure systems to avoid potential economic losses. The money in the account is <br /> continuously appropriated to the Board for immediate availability primarily for emergency repair <br /> I of water storage systems or water distribution systems. The account is intended to provide <br /> flexibility for the Board to make funds available in a timely manner in situations similar to the <br /> emergency that developed at Sanchez Reservoir in 1992. <br /> IThe balance in the Emergency Infrastructure Repair Account was $1,532,500 on June 30, <br /> 1995. The following projects have been authorized by the Board and constructed through the <br /> IEmergency Account. <br /> 1 <br /> Approved Contract <br /> Year Borrower/Emergency County Amount Amount <br /> I1993 Summit Reservoir and Irrigation Company - Montezuma 60,000 33,000 <br /> Repair a slide on the Summit Reservoir Dam and <br /> IRepair a portion of the Lost Canyon Ditch <br /> 1994 Windsor Canal and Reservoir Co. - Larimer 300,000 300,000 <br /> IPoudre Valley Canal Slide Repairs <br /> 1994 Town of Rangely - Rio Blanco 34,000 34,000 <br /> Raw Water Intake Structure Repairs <br /> I1995 . Castle Pines North Metro District - Douglas 101,500 100.500 <br /> Rehabilitate Well A-1 <br /> 1 Total 467,500 <br /> I <br /> ICWCB Annual Report, page-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.