My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Annual Report December 1996
CWCB
>
Publications
>
DayForward
>
CWCB Annual Report December 1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 11:44:42 AM
Creation date
8/14/2014 3:15:20 PM
Metadata
Fields
Template:
Publications
Year
1996
Title
Annual Report to the 61st Colorado General Assembly First Regular Session
CWCB Section
Agency-wide
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br /> 14 San Luis Valley Canal Company- Rio Grande $188 000 <br /> Y p Y , <br /> Diversion Structure Rehabilitation <br /> 15 Purgatoire River Water Conservancy District- Las Animas $500,000 <br /> Trinidad Project Refmance <br /> TOTAL $5,804,500 I <br /> *Loan to refinance a water project wholly or partially completed. <br /> • <br /> 1 <br /> I <br /> 3.9 Recommended Changes to Previous Loan Authorizations 1 <br /> The Board has recommended legislative authorization to provide additional loan expenditures 1 <br /> totaling$5.3 million to increase funding for two previously authorized water development projects. <br /> These projects are listed in Table 5, and additional details may be found in Appendix C. i <br /> TABLE 5 <br /> Colorado Water Conservation Board <br /> Recommended Changes to Previous Loan Authorizations <br /> Auth.Bill Prior Revised <br /> Name and Year Authorization Authorization <br /> City of Fort Collins and Larimer County- SB 96-153 $500,000 $920,000 <br /> Dry Creek Flood Control Project <br /> Eagle Park Reservoir Company- SB 96-153 $3,125,000 $8,000,000 <br /> Eagle Park Reservoir Rehabilitation I <br /> The City of Fort Collins and Larimer County were originally authorized a loan in the amount of <br /> $500,000 for a flood control project on Dry Creek. This recommendation would add$420,000 to the <br /> loan project. <br /> The Eagle Park Reservoir Company was originally authorized a loan in the amount of$3,125,000 <br /> from last year's funds for the rehabilitation of Eagle Park Reservoir strategically located in the <br /> headwaters of the Eagle River. This recommendation would add$4,875,000 to the loan project. <br /> CWCB FY96 Annual Report,page 22 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.