Laserfiche WebLink
i <br /> TABLE 2, Performance Audit Recommendations <br /> • <br /> Rec. ' <br /> No. Recommendation Summary _ Progress as of June 30, 1996 <br /> 1 Develop a formal,systematic program or process which Completed. The Board agreed to implement this <br /> provides a long-and short-term framework for the use of recommendation by 12/93. The Board identified 5 long- <br /> the Construction Fund. This process should include term goals at its January 1993 meeting. The Board attended <br /> • developing broad policy statements,establishing goals a retreat in October 1993 to develop a draft Long Range <br /> and implementation plans and developing performance Plan. The Board's Long Range Plan was formally adopted <br /> measures. on September 14, 1994. <br /> 1 <br /> 2 Develop and implement an effective process for long- Completed. The Board agreed to implement this <br /> term financial planning of Construction Fund monies. recommendation by 12/93. The Board staff worked with <br /> This process should include establishing long-term DNR accounting to set up a better method of systematically <br /> funding needs,assessing current sources of funds,and reporting revenues. All accounts have been reconciled. A <br /> projecting future funding requirements that may be water user needs survey was completed in July 1993. A <br /> needed to meet long-term goals. Long-Term Financial Projection for the Construction Fund <br /> was completed in December 1993. <br /> 3 Establish guidelines which include setting loan interest Completed. The Board agreed to partially implement this <br /> rates to reflect market interest rates. The Guidelines recommendation by 7/93. The Board approved new <br /> should be reflected in the projects that will be authorized "standard"interest rate guidelines at 2 basis points below the <br /> during the upcoming legislative session. then 30-year Treasury Bond rate for 30 years at its May 6-7, <br /> 1993 meeting. A project evaluation matrix is being used on <br /> new projects. <br /> 4 Charge interest on cash disbursements made to project Completed. The Board agreed to implement this <br /> sponsors during the construction phase of projects. recommendation by 12/93. The Board adopted this new <br /> Interest charges could be added to the principal amount policy at its May meeting. The Construction Fund <br /> of the loan and financed over the term of the loan. Guidelines have been revised to reflect the new policy. <br /> Contracts for future construction projects will require <br /> interest during construction. 1 <br /> 5 Improve Board monitoring of projects by contacting Ongoing. The Board agreed to implement this <br /> project sponsors at least annually to determine if project recommendation by 12/93. Letters are sent in March to the <br /> sponsors plan to go ahead with the projects. Responses sponsors for all authorized but not yet constructed CWCB <br /> should be documented and reported to the General projects. The staff evaluates the status of the project and <br /> Assembly on an annual basis. determines if it should be deauthorized. <br /> 6 Develop and implement procedures which would Completed. The Board agreed to implement this <br /> recover the Board's share of feasibility study costs for recommendation by 10/93. The Board adopted a new policy <br /> projects that are not constructed. Alternatives should be at its May meeting that stated the Board's participation in <br /> evaluated,including payback over a period of time. feasibility study costs must generally be repaid whether the <br /> project is constructed or not. The Guidelines have been <br /> revised to reflect this policy. <br /> 7 Develop methods to demonstrate Board compliance with Completed. The Board agreed to implement this <br /> procedures it has established,including documentation recommendation by 7/93. A project checklist was prepared <br /> of all Board reviews and approvals. by staff in July 1993. <br /> I <br /> CWCB FY96 Annual Report,page 14 <br />