My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Annual Report December 1996
CWCB
>
Publications
>
DayForward
>
CWCB Annual Report December 1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 11:44:42 AM
Creation date
8/14/2014 3:15:20 PM
Metadata
Fields
Template:
Publications
Year
1996
Title
Annual Report to the 61st Colorado General Assembly First Regular Session
CWCB Section
Agency-wide
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br /> 2.5 Projected Cash Balance <br /> . With a starting balance of$89.0 million in cash at the end of FY 1996 (reserved for authorized I <br /> projects), projected cash sources over the next ten years of $213.9 million, and projected <br /> expenditures over the next ten years of$142.2 million,the year-end cash balance of the Construction <br /> Fund is expected to decline as shown below. This means that the money will have been invested in <br /> the water users statewide rather than in the state treasury. About the year 2001, the cash balance <br /> is projected to level out between$18 and$20 million. <br /> I <br /> I <br /> YEAR-BC CASH BALANCE <br /> CWCB Construction Fund Long Term Financial Projection I <br /> 7UU <br /> . 4 4 6 <br /> • <br /> 80 <br /> 1 <br /> ter , <br /> 60 ¢ ¢ <br /> J 'a I <br /> 40 = <br /> L f g si . 4 tr 0 o I <br /> I <br /> r <br /> I} <br /> 4 <br /> FY95-96 FY96-97 FY97-98 FY98-99 FY99-00 F100-01 FY01-02 P102-03 P103-04 P104-05 <br /> I <br /> I <br /> I <br /> I <br /> 1 <br /> CWCB FY96 Annual Report,page 8 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.