My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150352 Intergovernmental Agreement
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150352 Intergovernmental Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 9:25:46 AM
Creation date
8/12/2014 4:20:28 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-069
C150393
Contractor Name
Boxelder Basin Regional Stormwater Authority
Contract Type
Loan
Water District
3
County
Larimer
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> potential for introduction of human-caused pollutants in accordance with the Urban Storm <br /> Drainage Criteria Manual Volume III—Best Management Practices, or such other subsequently <br /> adopted standard as the Directors may approve. The Members further intend and acknowledge <br /> that the enhancement and restoration of native vegetation,wildlife habitat,naturally meandering <br /> stream channel topography, and other similar natural features are beneficial for the sustained <br /> maintenance of the Boxelder drainage. <br /> • <br /> • <br /> Section 2.07. The Authority's Responsibilities. The Authority shall have the following <br /> responsibilities: - <br /> (a) Plan and establish a financial structure that equitably distributes among all <br /> properties within the Service Area the costs of the Boxelder Project. The financial <br /> structure will include both impact fees and service fees; <br /> (b) Plan -and arrange for the Operation and Maintenance of the Project <br /> Improvements; <br /> (c) • Plan and establish a financial structure that equitably distributes among all <br /> properties within the Service Area the costs of acquisition and construction of the Project <br /> Improvements, Operations and Maintenance of the Project Improvements and costs of <br /> administering and operating the Authority. The financial structure to fund said expenses <br /> will include service fees and such other sources of revenue as the Authority may <br /> determine to be appropriate and sufficient to support the acquisition and construction of <br /> the Project Improvements, the Operation and Maintenance of the Project Improvements <br /> and administration of the Authority,in a fiscally sustainable manner; <br /> (d) Obtain any necessary Stormwater MS4 Permitting. (stormwater quality) <br /> required for its undertaldngs within the Service Area; - <br /> (e) Comply with all local laws and requirements, including but not limited to <br /> land use and zoning laws and similarly applicable land use code provisions and <br /> floodplain and storm drainage regulatory requirements;and <br /> (f) Cooperate and collaborate with the Members, other governmental entities <br /> and jurisdictions,' nonprofit and private entities and persons and property owners, to <br /> incorporate into Authority project plans, to support, and to encourage the design of, <br /> development and use of Authority property and improvements, to provide for natural <br /> habitat preservation and restoration, preservation of viewsheds and aesthetic values, and <br /> transportation connections, and to advance other compatible public purposes and uses, <br /> insofar as the same are not in conflict with the primary stormwater objective of the <br /> Authority. - <br /> Section 2.08.• Enterprise Status. To the extent practicable, the Authority shall be • <br /> operated as an enterprise within the meaning of TABOR and the Water Activity Enterprise Law, <br /> Part I of Article 45.1, Title 37, G.R.S. For such purposes, payments to the Authority by <br /> 7 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.