My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-070 Intergovernmental Agreement
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
CT2015-070 Intergovernmental Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 9:26:11 AM
Creation date
8/12/2014 4:20:22 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-070
C150353
Contractor Name
Boxelder Basin Regional Stormwater Authority
Contract Type
Loan
Water District
3
County
Larimer
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
including execution of any security interest agreement associated with such funds as may be <br /> required by the Colorado Water Conservation Board. <br /> 2.7 CWCB Loan Feasibility Study. The funds made available by TDA pursuant to <br /> Section 2.3 above shall be included in the Loan Feasibility Study which is part of the application <br /> by the Authority to obtain approval of the CWCB loan. TDA agrees to provide all <br /> documentation including, but not limited to,availability of funds to meet the obligations of TDA <br /> pursuant to the terms and conditions of this Agreement. <br /> ARTICLE 3 <br /> TARGETED TIMELINE <br /> Attached hereto as "Exhibit B" and incorporated herein by this reference, is the <br /> anticipated timeline for completion the various components of the Projects. The parties <br /> understand and agree that completion of the individual components of the timeline are subject to <br /> change, including extension thereof, due to factors beyond the control of and unforeseen by the <br /> parties at this time. Unforeseen factors include,but are not limited to: <br /> (a) unforeseeable design and/or engineering factors, which are not caused by acts or <br /> omissions of the Authority,and which delay the ability of the Authority to design and <br /> engineer the Projects or any portion thereof; <br /> (b) unforeseeable regulatory issues, which are not caused by acts or omissions of the <br /> Authority,with any federal,state or local government agency having jurisdiction over <br /> the Projects or any part thereof, including, but not limited to, 404 permit, State <br /> Engineers approval and FEMA approval of CLOMR; <br /> (c) unforeseeable cause(s) beyond the control of the Authority including, but not limited <br /> to, acts of God, national emergencies, or other incidents beyond the control and not <br /> due to the fault of the Authority; and <br /> (d) unforeseeable issues in the acquisition of appropriate land,easements,and/or right-of- <br /> ways to allow the Authority to construct the Projects which are not caused by acts or <br /> omissions of the Authority. <br /> ARTICLE 4 <br /> CONTINGENCIES <br /> The obligation of the Authority to finalize the design and construct the Projects shall be <br /> specifically contingent upon the occurrence of the following events: <br /> Page 6 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.