My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-070 Intergovernmental Agreement
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
CT2015-070 Intergovernmental Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 9:26:11 AM
Creation date
8/12/2014 4:20:22 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-070
C150353
Contractor Name
Boxelder Basin Regional Stormwater Authority
Contract Type
Loan
Water District
3
County
Larimer
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. Complete the conceptual design of the East Side Detention Facility <br /> and Larimer and Weld Canal Crossing, including modeling and <br /> collaboration with the Lake Canal Ditch Company to determine the <br /> acceptable crossing structure to accomplish the goals of the <br /> Authority's Master Plan; <br /> 3. Initiate Final Design efforts (including Phase II of the geotechnical <br /> investigation - seismic site, seepage and stability analysis) for the East <br /> Side Detention Facility and Larimer and Weld Canal Crossing in order <br /> to prepare estimated costs for use in a loan application to the Colorado <br /> Water Conservation Board; <br /> 4. Initial coordination, meetings and preparation for United States Army <br /> Corps of Engineers permitting and coordination with the Colorado <br /> Office of the State Engineer;and <br /> 5. Coordination, preparation, design and engineering for conditional <br /> letter of map revision (CLOMR) and letter of map revision (LOMR) <br /> which are required by the Projects extending from the detention <br /> facility to where Boxelder Creek crosses under Interstate 25. <br /> (c) The work described in Subsection 2.2(b)is intended to allow Authority to <br /> maintain an efficient design, submittal and construction schedule focused on an expedited <br /> completion of the Projects in a timely manner with a targeted completion by the end of 2014. <br /> (d) The Authority hereby agrees to maintain appropriate documentation and <br /> make any reports,data or design deliverables produced for the Authority available for the TDA's <br /> review and use. <br /> 2.3 Funding. <br /> (a) Following the design engineering phase described above,the TDA hereby <br /> agrees that it shall provide funds toward the Authority's Construction Costs and Financing Costs <br /> of the Projects ("Costs") in an amount not to exceed twenty-five percent (25%) of the Costs <br /> actually incurred by the Authority (the "Funding Contribution"). The Costs of the Projects are <br /> currently estimated to be $9,900,000. Payments under this agreement shall be due within 45 <br /> days of receipt of an invoice prepared by the Authority and are contingent upon a satisfactory <br /> showing that the Authority has readily available funds to match the funds requested from the <br /> TDA in the amount of three (3) dollars for every one (I) dollar requested from the TDA by the <br /> Authority. In the event that the Costs exceed the estimate stated above, the Authority agrees to <br /> meet with TDA and provide documentation to TDA confirming the need to increase the <br /> estimated Costs of the Projects. Moreover,the parties agree that any Project Cost increases in <br /> excess of 25% of the estimated budget shall be subject to mutual approval by the parties. The <br /> parties understand and agree that a part of the purpose of the ongoing design and engineering for <br /> the Projects is to provide more accurate information as to the Costs of the Projects. <br /> Page 4 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.