My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-070 Contract
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
CT2015-070 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2016 8:25:16 AM
Creation date
8/12/2014 4:20:19 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-070
C150353
Contractor Name
Boxelder Basin Regional Stormwater Authority
Contract Type
Loan
Water District
3
County
Larimer
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 4-BOARD APPROVAL <br /> At its May 14, 2013 meeting the CWCB approved a Small Project Loan, from the <br /> Construction Fund to the BORROWER, in an amount up to $7,100,000 for PROJECT <br /> costs not to exceed 90% of the cost of the PROJECT, with a loan origination fee of 1% <br /> in accordance with CWCB Policy No. 16 resulting in a loan origination fee of $71,000 <br /> and a total loan amount of $7,171,000 at an interest rate of 2.75% per annum for a <br /> repayment term of 15 years. <br /> SECTION 5—SCHEDULE OF EXISTING DEBT <br /> The BORROWER has been approved for two additional loans with the Colorado Water <br /> Conservation Board. Contract #C150352, in the loan amount of $1,010,000.00, with <br /> annual payments of $83,081.76 with an interest rate of 2.75% per annum and a term <br /> of 15 years and Contract #C150393, in the loan amount of $818,100.00, with annual <br /> payments of $66,075.04 with an interest rate of 2.50% per annum and a term of 15 <br /> years. <br /> SECTION 6—ADDITIONAL CONDITIONS&CONTRACT REQUIREMENTS <br /> The Authority will not seek, and CWCB will not disburse, loan funds until the <br /> Authority has the right of possession to all property necessary for this CONTRACT <br /> (CWCB Loan Contract No. C150353). If land is to be acquired through <br /> condemnation, this will be evidenced by an Order of Possession. If land is to be <br /> acquired through negotiated real estate contract(s), this will be evidenced by a <br /> binding real estate contract between the Authority and the property owner. <br /> SECTION 7—CONSTRUCTION FUND PROGRAM PROCEDURES <br /> A. The BORROWER shall employ an engineer, registered in the state of Colorado to <br /> prepare plans and specifications for the PROJECT. <br /> B. Engineering contracts, plans and specifications must be submitted to the CWCB <br /> staff for verification of compliance with the terms of this CONTRACT when available <br /> prior to bidding. Any modifications to the plans and specifications must be <br /> approved in writing by the CWCB staff. <br /> C. For plans and specifications for all jurisdictional dams and reservoirs, as defined <br /> by § 37-87-105 C.R.S., the BORROWER shall provide a letter of approval from the <br /> State Engineer's Office prior to construction. <br /> D. The BORROWER shall extend an invitation to CWCB to be present at the bid <br /> opening. <br /> E. The BORROWER shall contract for the construction of the work with responsible and <br /> capable Construction Firms, which said Construction Firms shall be selected by <br /> the BORROWER and found acceptable by the CWCB staff. <br /> F. The BORROWER must provide a copy of the executed construction contract <br /> Appendix 1 to Loan Contract C150353 <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.