My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153328 PIF Contract
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C153328 PIF Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2014 11:25:10 AM
Creation date
8/7/2014 11:25:09 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153328
Contractor Name
Henrylyn Irrigation District
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> =rrn 6-AC-02A <br /> DE ENT OR AGENCY NUMBER <br /> r :4, '-04-00 <br /> CONTRACT ROUTING NUMBER <br /> , 7o f4 <br /> I <br /> CONTRACT $653,000 <br /> THIS CONTRACT, made this 1 st day of p1- mh r 198.0., by and between the <br /> State of Colorado for the use and benefit of the Department of •t Natural RPsnnrras <br /> (Colorado Water Conservation Board) <br /> hereinafter referred to as the State, and •2— •-11 . '0. •4111 5 ' • • •- <br /> Dam Project) P.O. Box 85, Iius9son, Col ado 80642 <br /> hereinafter referred to as the contractor, <br /> WHEREAS, authority exists in the Law and Funds have been budgeted, appropriated and otherwise made <br /> available and a sufficient unencumbered balance thereof remains a ilable for yment in Fund Number4008 , <br /> G/L Account Number 5'1157 , Contract Encumbrance Number :��. c and <br /> WHEREAS, required approval, clearance and coordination has been accomplished from and with appropriate <br /> agencies; and <br /> WHEREAS, pursuant to the provisions of 37-60-119, Colorado Revised Statutes <br /> 1973, as amended, the State is authorized to construct certain water projects for <br /> the benefit of the people of the State; and <br /> WHEREAS, the Contractor is an Irrigation District in the State of Colorado <br /> and wishes to undertake repairs of the Prospect and Lord Dams, hereinafter called <br /> the project, for the members of the Henrylyn Irrigation District in Weld County, <br /> Colorado, at an estimated cost of about Six Hundred Fifty-Three Thousand Dollars <br /> ($653,000) ; and <br /> WHEREAS, the State has agreed to construct part of said project and to sell <br /> the same to the Contractor upon mutually agreeable terms and conditions, subject <br /> to the approval of appropriations for that purpose by the Colorado General <br /> Assembly and the Governor of the State of Colorado; and <br /> WHEREAS, pursuant to Senate Bill No. 67, Fifty-Second General Assembly of <br /> the State of Colorado, duly enacted by the Colorado General Assembly and approved <br /> by the Governor of the State of Colorado, there was appropriated to the State <br /> the sum of Six Hundred and Fifty-Three Thousand Dollars ($653,000) plus or minus <br /> such amounts as may be justified by reason of ordinary fluctuation in construction <br /> costs for construction of part of the project; and <br /> WHEREAS, the Contractor has available from its own , u 4 . ' N, om other <br /> sources sufficient funds to construct the remaind of the • - - J1 <br /> rati <br /> NOW THEREFORE, in consideration of the mutua ep is herein <br /> contained, it is agreed by the parties as follows: <br /> A. The Contractor agrees that it will: <br /> 1. Cause the construction of said project to be completed within two (2) <br /> years of the date of this contract in accordance with the project plans and <br /> specifications and any necessary modification thereof approved by the State. <br /> No payment will be made under this contract until the Contractor has submitted <br /> project plans and specifications and said project plans and specifications have <br /> been approved by the State. The above mentioned time may be extended by the <br /> State if such time is insufficient because of acts of God or other acts or <br /> circumstances beyond the control of the Contractor. <br /> 2. Convey or cause title to be conveyed by deed or other proper conveyance <br /> to the State, the following portions of the proposed project facilities: <br /> (a) An individual one-tenth (1/10) interest in and to the Prospect <br /> Dam located in Sections 25, 26, 35 & 36 in Township 1 N, in Range 64W, <br /> 6th P.M., together with all inlet and outlet ditches and structures <br /> appurtenant thereto or used in connection therewith. <br /> 3. Permit periodic inspection of construction by the authorized representa- <br /> tives of the State during construction and permit the. State to review and approve <br /> or disapprove any contracts for the construction of the project or the performance <br /> of work pursuant to such contracts or subcontracts. <br /> 4. Without expense to the State, manage, operate, and maintain the project <br /> Page I of.-pages <br /> *(See instructions on reverse of last page.) <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.