My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150342 Increase Request
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150342 Increase Request
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2014 2:08:40 PM
Creation date
8/7/2014 8:23:16 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-012
C150342
Contractor Name
Sanchez Ditch and Reservoir Company
Contract Type
Loan
Water District
24
County
Costilla
Loan Projects - Doc Type
Default Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4:59 PM SANCHEZ DITCH&RESERVOIR COMPANY <br /> 06/09/14 Balance Sheet <br /> Accrual Basis As of June 9, 2014 <br /> Jun 9, 14 <br /> Long Term Liabilities <br /> CWCB Contract C 150342 94,297.06 <br /> CWCB Contract C153623 49,878.16 <br /> CWCB Contract C153755 173,956.29 <br /> Less Current Portion -35,994.00 <br /> Total Long Term Liabilities 282,137.51 <br /> Total Liabilities 318,503.51 <br /> Equity <br /> Net Assets Unrestricted 672,880.52 <br /> Net Income 90,578.44 <br /> Total Equity 763,458.96 <br /> TOTAL LIABILITIES & EQUITY 1,081,962.47 <br /> 41Vi Page 3 <br /> 9 aged OLLS17L26TLT 311301113JXdd 13CH3S131 dH WdSS :2I 17.102 OT unr <br />
The URL can be used to link to this page
Your browser does not support the video tag.