Laserfiche WebLink
OPINION OF COST <br /> SANCHEZ RESERVOIR <br /> ADDITIONAL SCOPE OF WORK <br /> Item No. Description Qty Units Unit Price Amount <br /> 1 Seepage Collection <br /> Excavation(Exacavator) 40 Hrs $ 175.00 $ 7,000 <br /> Load& Haul Materials(End Loader) 40 Hrs $ 125.00 $ 5,000 <br /> 12"PVC Pipe-slottted 125 L.F. $ 20.00 $ 2,500 <br /> Place PVC Pipe 40 Hrs $ 60.00 $ 2,400 <br /> No. 8 Gravel 50 Tons $ 125.00 $ 6,250 <br /> Backfill 200 C.Y. $ 20.00 $ 4,000 <br /> $ 27,150 <br /> 2 Outlet Conduit Concrete Repair <br /> Sandblast/Waterblast 3600 S.F. $ 10.00 $ 36,000 <br /> Patch 750 Bags $ 180.00 $ 135,000 <br /> $ 171,000 <br /> 3 Gate Control System <br /> Hydraulic Power Unit 1 L.S. $ 15,000.00 $ 15,000 <br /> Control System Installed 1 L.S. $ 35,000.00 $ 35,000 <br /> $ 50,000 <br /> TOTAL CONSTRUCTION COST $ 248,150 <br /> Original Contract Amount $ 2,032,000.00 <br /> Enginering Cost To date $ 171,449.00 <br /> Remaining $ 1,860,551.00 <br /> Construction Contract $ 1,828,400.00 <br /> Construction Engineering $ 80,000.00 <br /> Added Construction Scope-Seepage&Conduit Patchin $ 248,150.00 <br /> TOTAL CONSTRUCTION COST $ 2,156,550.00 <br /> Less Remaining From Abovt $ 1,860,551.00 <br /> TOTAL ADDITIONAL FUNDING REQUIRED $ 295,999.00 <br />