My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150342 Increase Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150342 Increase Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2014 2:08:40 PM
Creation date
7/31/2014 2:40:36 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-012
C150342
Contractor Name
Sanchez Ditch and Reservoir Company
Contract Type
Loan
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Construction Loan Program C150342 <br /> Project Data Sheet <br /> (Increase) <br /> Borrower: Sanchez Ditch and Reservoir Co. County: Costilla <br /> Project Name: Sanchez Reservoir Outlet Project Type: Dam Rehabilitation <br /> Rehabilitation Project <br /> Basin / District: Rio Grande / 24 Water Source(s): Ventero Creek <br /> Total Project Cost: $2,282,000 Funding Sources: Construction Fund Et WSRA <br /> (Basin a Statewide funds) <br /> Type of Borrower: Agricultural Average Diversions: 15,000 AF <br /> (Interest Rate Increased by 0.25% for longer term) <br /> Loan Amount: $1,381,276 (Including 1% fee) Interest Rate: 2.0% Term: 40 years <br /> WSRA Grant Amounts: $55,000 Rio Grande Basin Et $859,400 Statewide <br /> The Company provides irrigation water for users in Costilla County, southwest of the town of San Luis. <br /> The Company's primary storage reservoir is Sanchez Reservoir. The approximately 104,000 acre-foot <br /> reservoir was built in 1910. The reservoir's outlet includes a 135 foot tall concrete gate tower. In order <br /> to access the gates to operate the dam, a tramway/gondola runs along a cable and is powered by a <br /> portable gasoline generator. Because daily access to the tower is required during irrigation season, the <br /> reliability and safety of the gondola system has been a concern of the Company. Using loan and grant <br /> funds, the Company intends to address the safety and operational management concerns at the reservoir <br /> through the demolition of the gate tower; the installation of new control gates and operators; patching <br /> the outlet conduit; repairing the downstream outlet structure; and, installing a new perimeter drain and <br /> weir along the right side of the outlet structure to control seepage. The project schedule is estimated <br /> as: final design and State Engineer's Office (SEO) approval by August 2014; bid the project in May of <br /> 2014; award the bid by August of 2014; start construction in September of 2014; complete construction <br /> by March of 2015. <br /> Culebra Cerritos Canal <br /> RYi Ibis <br /> San Acacio <br /> 1" � r '":.' zt Viejo San Acacio <br /> San Luis <br /> y� <br /> Cu\ebra <br /> C Belt <br /> + Cl ult.bra Creek Gauging Station <br /> ! I Stabilization Reservoir <br /> M�a °' am. .'A.,.. m <br /> - _ Um Sanchez Stabilizing Dam <br /> s ` San Pedro <br /> .t •°`"", �_ f.� <br /> G. Sari Pablo <br /> ce.V.w olG <br /> :t,°^� w,mvo.a• . <br /> Sanchez <br /> Reservoir �a <br /> S anchez Dam <br /> aw a cr <br /> 3e <br /> Sanchez Reservoir <br /> rvice Area Boundary <br />
The URL can be used to link to this page
Your browser does not support the video tag.