My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150342 Increase Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150342 Increase Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2014 2:08:40 PM
Creation date
7/31/2014 2:40:36 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-012
C150342
Contractor Name
Sanchez Ditch and Reservoir Company
Contract Type
Loan
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Sanchez Ditch and Reservoir Company Agenda Item 25a <br /> July 16-17, 2014 Board Meeting(Updated July 18, 2014) <br /> Page 2 of 4 <br /> Background <br /> The Company provides irrigation water for users in Costilla County, southwest of the town of San Luis. <br /> The Company's primary storage reservoir is Sanchez Reservoir. The 103,155 acre-foot reservoir was <br /> built in 1910 and is impounded by two separate earthfill dams known as the Main Dam and East Dike. <br /> The Main Dam is 135 feet tall and 1,170 feet long and is classified as a large, high hazard structure. <br /> The reservoir's outlet includes a 135-foot concrete gate tower. Within the tower, there are eight sets <br /> of 30-inch diameter valves located at varying elevations. Water exits the gate tower through a 10 '/z <br /> foot concrete outlet conduit that is approximately 600 feet long. In order to access the gates to <br /> operate the dam, a tramway/gondola runs along a cable and is powered by a portable gasoline <br /> generator. Because daily access to the tower is required during irrigation season, the reliability and <br /> safety of the gondola system has been a concern of the Company. <br /> In July of 2011, the Company was awarded $95,000 in WSRA grants ($10,000 from the Rio Grande Basin <br /> Account and $85,000 from the Statewide Account) to assess the deteriorating infrastructure and safety <br /> concerns of the reservoir. That study, titled "Phase I Assessment £t Upgrade," concluded that <br /> abandoning the gondola and replacing the outlet works with remotely operated valves would provide <br /> for the most efficient management of the water and would improve safety for Company employees. <br /> Project Update <br /> In May of 2014, the Company bid the Project with a construction budget of$1.8M. The contractor's <br /> bids ranged from $2.5M to $3.7M. At the same time, the Company and its engineer had conversations <br /> with the State Engineer's Office Dam Safety Branch regarding seepage issues at the Reservoir. Working <br /> with the low bidder (Moltz Constructors, Inc.) and its engineer, Duane Smith, P.E., of Smith <br /> Geotechnical, Inc., the Company plans to scale back some of the outlet tunnel repairs and is adding <br /> additional seepage control work to the Project. It anticipates an additional $250,000 will be required <br /> to complete the Project. <br /> Schedule: Construction is expected to begin in the summer of 2014. <br /> Financial Analysis <br /> At the time of the original loan approval, the Company qualified for the agricultural interest rate of <br /> 1.75% for a 30-year term. Due to the increased Project costs, the Company requested a hardship <br /> exemption and has asked for a 40-year loan term in order to keep the shareholder assessments close to <br /> the originally budgeted amount. Per CWCB Financial Policy#7, we typcially reduce the interest rate by <br /> 0.25%when borrowers reduce the term by 10 years. In this case, staff is recommending increasing the <br /> interest rate by 0.25% to adjust for the longer loan term. Table 1 provides a financial summary of the <br /> loan request. <br />
The URL can be used to link to this page
Your browser does not support the video tag.