Laserfiche WebLink
* J <br /> STATE OF COLORADO <br /> Colorado Water Conservation Board <br /> Department of Natural Resources <br /> 721 Centennial Building `��; <br /> 1313 Sherman Street <br /> Denver,Colorado 80203 <br /> Phone:(303)866-3441 <br /> FAX:(303)866-4474 Roy Romer <br /> Governor <br /> James S.Lochhead <br /> Executive Director,DNR <br /> December 27, 1996 Director,CIWCBE <br /> Mr. Steve Treadway, President <br /> The South Platte Lower River Group RE: Ground Water Recharge <br /> C/O LSPWCD Office Demonstration Projects <br /> 100 Broadway Plaza, Suite 12 Grant Approval 53 1 <br /> Sterling, CO 80751 <br /> Dear Mr. Treadway, <br /> Concerning your application for a grant from the Construction Fund, I am pleased to inform you <br /> the Colorado Water Conservation Board (CWCB) has approved your request for $300,000. It <br /> is our understanding these funds will be used to continue the Tamarack project, and other ground <br /> water recharge demonstration projects on the lower South Platte River. <br /> The CWCB approved the grant as recommended by the CWCB staff. I have attached a copy of <br /> the updated Board memo concerning The South Platte Lower River Group. Please refer to page <br /> 2 of that memo and to the section "Action Taken by the CWCB, November 25,1996". <br /> When the Board approves your grant, there remain several conditions: <br /> • <br /> a. The Scope of Study must be finalized. John Van Sciver will assist you with <br /> revisions to the Scope of Study. <br /> b. A contract must be completed before funds can be advanced on your grant. You <br /> will be working with Jan Illian during the contracting process, which usually takes <br /> 3 to 6 months to complete. Jan will assist you with documents necessary as part <br /> of the contracting process. <br />