My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150317 Contract
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150317 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2014 2:06:03 PM
Creation date
7/8/2014 2:01:49 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-013
C150317
Contractor Name
Lake Durango Water Authority
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 5—SCHEDULE OF EXISTING PARITY BONDS <br /> The Borrower's governmental agency bond, issued to the Colorado Water Resources and <br /> Power Development Authority on July 15, 2009, in the original principal amount of <br /> $2,000,000; and <br /> The Borrower's Taxable Water Revenue Bonds, Series 2009, issued on July 15, 2009, in <br /> the original principal amount of$500,000. <br /> SECTION 6—ADDITIONAL CONDITIONS&CONTRACT REQUIREMENTS <br /> CWCB will not disburse loan funds until Borrower notifies the CWCB in writing that all legal <br /> issues concerning the purchase of Animas-La Plata (A-LP) project water are resolved and <br /> Borrower provides CWCB with an executed agreement for the use of the A-LP intake <br /> structure. <br /> SECTION 7—CONSTRUCTION FUND PROGRAM PROCEDURES FOR WATER PURCHASE PROJECTS <br /> A. The BORROWER must submit a written appraisal or opinion of value from a qualified water <br /> rights appraiser supporting the purchase price prior to disbursal of loan funds for the <br /> water purchase. <br /> B. The BORROWER shall pay their portion of all of the expenses related to the WATER <br /> PURCHASE, as agreed to in the agreement between the BORROWER and the La Plata West <br /> Water Authority, when such bills are due. <br /> SECTION 8—CONSTRUCTION FUND PROGRAM PROCEDURES <br /> A. Engineering contracts, plans and specifications must be submitted to the CWCB staff for <br /> verification of compliance with the terms of this CONTRACT when available prior to bidding. <br /> Any modifications to the plans and specifications, that effect changes to the construction <br /> costs, must be approved in writing by the CWCB. <br /> B. For plans and specifications for all jurisdictional dams and reservoirs, as defined by § 37- <br /> 87-105 C.R.S., the BORROWER shall provide a letter of approval from the State Engineer's <br /> Office prior to construction, if required. <br /> C. The BORROWER shall notify CWCB of the bid opening date, time and location. <br /> D. CWCB must approve the award of the construction contract. <br /> E. The BORROWER must provide a copy of the executed construction contract documents <br /> consisting of the contractor's proposal, construction contract, performance bond, payment <br /> bond, notice of award, notice to proceed, sample change order, and sample field order, <br /> as well as the advertisement for bid and bid bond at bidding. After the CWCB staff <br /> verifies that these documents comply with the terms of this CONTRACT, a notice to <br /> proceed may be issued. <br /> F. The BORROWER shall construct the PROJECT in accordance with the approved plans and <br /> specifications. <br /> Appendix 1 to Loan Contract C150317 <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.