Laserfiche WebLink
WEST RHONE LATERAL DITCH COMPANY <br /> WEST RHONE LATERAL DITCH RECONSTRUCTION PROJECT <br /> 4t,' µ ''' ' -4 .., ` j ' ' -' -. al C ._ <br /> 1.!Yom, <br /> ,_..114, f ` <br /> aesx..? <br /> s s <br /> W.b.'}� <br /> 12 inch plastic pipe and various concrete control vaults along the west side of 21 Road. <br /> Project Description <br /> This $130,000 project involved the reconfiguration of the West Rhone Lateral Ditch <br /> Company's existing lateral,which was operated under Lateral 395 off the Grand Valley Irrigation <br /> Canal. West Rhone's current use under Lateral 395 was abandoned and a new lateral and <br /> diversion point off the Grand Valley Irrigation Canal was constructed. The new lateral involved <br /> 1.25 miles of 12" - 100 psi plastic pipe on a new alignment and the construction of a new <br /> diversion structure on the Grand Valley Canal. The NRCS, Grand Junction office completed the <br /> design and the project was constructed by Dominguez Farms,out of Grand Junction, Colorado. <br /> Project Data <br /> Sponsor: West Rhone Lateral Ditch Co. County: Mesa Water Source: Grand Valley Canal <br /> Terms of Loan: $100,000 @3.55%for 30-years Substantial Completion Date: Sept. 1,2001 <br /> Design Engineer: Natural Resource Conservation Service-Grand Junction, Colorado <br /> Construction Contractor: Dominguez Farms, Inc. - Grand Junction,Colorado <br /> Design Criteria: 6,6001.f. of 12" - 100 PSI Plastic Pipe 3"- 10" Cast Iron Gate Valves <br /> 7'L x 3'W x 6'H Concrete Outlet Structure <br /> Annual Volume of Water Delivered by the Project: 2,278 acre-ft. <br />