Laserfiche WebLink
regulations. <br />F. Actual construction as called for in the design documents and in change orders <br />approved by the CWCB and the BORROWER. <br />G. Engineering services for construction management, including design and <br />construction management for CWCB-approved change orders. <br />H. Interest during completion of the PROJECT pursuant to Paragraph A.4 of the <br />CONTRACT. <br />I. Legal services for reviewing engineering services contracts, reviewing this <br />CONTRACT, reviewing construction contract documents, and for complying with all <br />federal, state, and local regulatory requirements. <br />J. PROJECT -related expenses incurred prior to the Effective Date of this CONTRACT in <br />accordance with the approval of this loan. <br />SECTION 10 — DISBURSEMENT SCHEDULE <br />For Project costs: The BORROWER shall prepare a periodic progress report which <br />contains a statement of the PROJECT costs expended for that period and shall <br />forward said statement to the CWCB. After receipt of the periodic progress report <br />from the BORROWER, and review and acceptance of the items therein as eligible <br />expenses as described above, the CWCB will pay to the BORROWER the amount set <br />forth in the report or such portion that has been approved by the CWCB. Such <br />payment shall be made within thirty (30) days from the CWCB's approval of each <br />progress report. <br />SECTION 11 — TIME FOR PERFORMANCE <br />PROJECT Beginning: Upon Effective Date of this CONTRACT (the date this <br />CONTRACT is signed by the State Controller or his designee). <br />PROJECT Finish: Three (3) years from the Effective Date of this CONTRACT. <br />[THE REST OF THIS PAGE INTENTIALLY LEFT BLANK] <br />Appendix 1 to Loan Contract C150392 <br />Page 4 of 4 <br />