My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150349 Application
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150349 Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2014 4:32:26 PM
Creation date
5/29/2014 12:56:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150349
Contractor Name
Ordway Feedyard, LLC
Contract Type
Loan
Water District
17
County
Crowley
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Supply Reserve Account—Application Form <br /> Revised December 2011 <br /> 2. For Applications that include a request for funds from the Statewide Account,describe how the water <br /> activity/project meets all applicable Evaluation Criteria. <br /> Tier 1: Promoting Collaboration/Cooperation and Meeting Water Management Goals and Identified Water <br /> Needs <br /> a. The water activity addresses multiple needs or issues, including consumptive and/or non-consumptive needs,or <br /> the needs and issues of multiple interests or multiple basins. <br /> Multiple Consumptive Needs/Benefits <br /> • Combined transit and gvaporative losses sustained under the current delivery regimen were 66%in 2012(data <br /> source-State Engineers Office and Colorado Canal Co). The Feedyard owns 3 Twin Lakes shares and 569 Colorado <br /> Canal shares. This means that the Feedyard was forced to lease or purchase from the spot market an additional 882 <br /> acre feet of year just to cover evaporative loss and still provide 500 acre feet of water to the feedyard. The Feedyard <br /> lost 954 acre feet of water in order to provide 500 acre feet of water to the feedyard. This pipeline project eliminates <br /> 850 acre feet of that loss,conserving and freeing up that water for M&I use by multiple basins. <br /> • The current water supply is not secure. Spot market purchases of water will be increasingly vulnerable to climate, <br /> population growth,and other factors outside the control of the feedyard. This project reduces the amount of water <br /> needed,and eliminates the necessity of spot market purchases for the foreseeable future. <br /> • The current water supply storage and delivery system is not secure. The majority of Lake Henry water rights are held <br /> by Front Range cities. The reservoir's water levels are controlled mainly by Front Range users,creating another <br /> area of increased vulnerability for the company. When less water is stored in Lake Henry,evaporation rates become <br /> greater. In the 2012 drought,the Feedyard was forced to install a floating pump in Lake Henry in order to get <br /> required water from the Lake. The proposed project replaces this delivery system. <br /> • With use of Feedyard-owned wells,augmentation water could be stored at higher elevation reservoirs,further <br /> reducing evaporative loss. <br /> • Water quality from project wells is of higher quality than water that is currently being used. The project conserves <br /> potable water by allowing the conversion of the feed mill to a non-treated water source. The Feedlot currently <br /> uses an average of about 500,000 gallon of treated,potable water per month from 96 Pipeline Company,mostly <br /> for their feed mill. With the clean well water supply and future conversions at the mill,well water will replace <br /> the potable water from 96 Pipeline. Assuming that this conversion could reduce the 96 Pipeline use by 400,000 <br /> gallon per month,approximately 14 ac/ft per year of potable M&I water would be saved. Table 1-7 of the AV <br /> Conduit Draft EIS shows that the 2010 96 Pipeline demand was 56 ac/ft. Page A.1-4 states that AVC deliveries <br /> to 96 Pipeline are estimated to be 27 ac/ft per year of Fry-Ark allocations. This savings,therefore,would reduce <br /> that required allocation by over 50 percent,freeing up this water supply for M&I use. <br /> Non-Consumptive Benefits <br /> The water activity addresses multiple non-consumptive environmental and recreational needs. <br /> • Riparian Habitat: Water will no longer be diverted at Boone. The diversion point moves downriver, improving <br /> wetlands,riparian and aquatic habitat along an estimated 36-mile reach of the Arkansas River. <br /> • Improved Air Quality: Some water savings will be used for much-needed dust abatement, improving air quality, <br /> human health and the aesthetics of the surrounding area. <br /> Multiple Interests <br /> • Installation of ten fire hydrants along the waterline provides an emergency water supply to fight farmstead and <br /> wild land fires from west of Crowley to east of Ordway. A 2008 wildfire in rural Crowley County killed two <br /> firefighters, destroyed 22 structures and damaged 11 others. Destroyed structures were valued at a total of <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.