My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150403 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150403 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2014 4:42:48 PM
Creation date
5/28/2014 1:20:13 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150403
Contractor Name
Castle Pines Metropolitan District
Contract Type
Loan
County
Douglas
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Castle Pines Metropolitan District Agenda Item 29b <br /> May 9,2014(Updated May 23,2014) <br /> Page 3 of 7 <br /> Background <br /> The District is located between Denver and Castle Rock in the unincorporated community of Castle <br /> Pines Village in Douglas County. The primary functions of the District are to provide street repair <br /> and maintenance, snow removal,road right-of-way maintenance, water treatment and distribution, <br /> sewer collection and storm drainage management services to the property owners of Castle Pines <br /> Village. The District's facilities include two water treatment plants, eight potable wells, one <br /> irrigation only well,two storage tanks, one potable water pump station, one irrigation/raw water <br /> pump station, and over 59 miles of pipeline. <br /> The District's service area is approximately 80%developed from a demand perspective, with a <br /> projected average annual demand of 1,634 AF at full build out. Annual produced water demands <br /> have averaged approximately 1,056 AF the last five years. The District's entire water supply comes <br /> from non-tributary groundwater, which is considered a non-renewable source. The District's Water <br /> Conservation Plan was approved by the CWCB in February 2010. <br /> Loan Feasibility Study <br /> Sue Mantz, District Accounting Supervisor, and Paul Dannels, District Manager, prepared the Loan <br /> Feasibility Study titled"CPMD Participation in the Chatfield Reservoir Reallocation Project," <br /> dated April 2014, with support from Gina Burke, Vice President, Jelin Water Consultants, and legal <br /> review from Scott Clark, Esq. with Burns Figa& Will. The study was prepared in accordance with <br /> CWCB guidelines and includes an alternative analysis, cost estimates, and financial statements. The <br /> feasibility study relies on the FR/EIS prepared by the Corps, and the Fish, Wildlife and Recreation <br /> Mitigation Plan(FWRMP)prepared by the Relocation Participants in accordance with C.R.S. 37- <br /> 60-122.2. <br /> Borrower—Castle Pines Metropolitan District <br /> The District was organized by a court order on June 14, 1973, following an election by the property <br /> owners in the District. The District serves Castle Pines Village which has approximately 4,500 <br /> residents and a total of 1,700 water taps. District funds are divided into its General Fund and <br /> Enterprise Fund. General Fund revenues are primarily derived from property taxes and the <br /> Enterprise Fund revenues are primarily derived from fees charged from services. <br /> A five-member Board of Directors governs the District and is empowered to levy a property tax on <br /> real and personal properties located within its boundaries. Through its water activity enterprise,the <br /> Board can authorize the District to incur debt and set water rates as required to cover operating <br /> expenses. <br /> Water Rights <br /> The District's water rights portfolio includes Denver Basin groundwater rights and Plum Creek and <br /> South Platte surface water rights. Currently, all water supplies come from non-tributary <br /> groundwater wells. Storage rights are held by the District in Plum Creek Reservoir(not yet <br /> constructed). In anticipation of the Project, the District, in conjunction with Castle Pines North <br /> Metropolitan District, obtained a 1,000 AF conditional storage right in Chatfield in Case No. <br /> 04CW308. <br /> CHATFIELD REALLOCATION DESCRIPTION <br /> THE GOAL OF THE REALLOCATION IS TO HELP ENABLE WATER PROVIDERS SUPPLY WATER TO LOCAL <br /> USERS IN RESPONSE TO RAPIDLY INCREASING DEMAND.THE STATEWIDE WATER SUPPLY INITIATIVE <br /> 2010 REPORT(SWSI 2010)HAS IDENTIFIED THE PROJECTED GAP IN MUNICIPAL&INDUSTRIAL(M&I) <br /> AND SELF-SUPPLIED INDUSTRIAL(SSI)USE IN THE METRO BASIN ALONE WILL BE BETWEEN 180,000 <br /> AND 280,000 AF PER YEAR BY THE YEAR 2050. THE CHATFIELD REALLOCATION PROJECT IS <br /> IDENTIFIED IN SWSI 2010 AS AN IDENTIFIED PROJECT AND PROCESS(IPP)FOR THE METRO AND <br />
The URL can be used to link to this page
Your browser does not support the video tag.