My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150396 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150396 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2015 3:28:15 PM
Creation date
5/28/2014 1:17:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-140
C150396
Contractor Name
Northern Colorado Water Conservancy District
Contract Type
Loan
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Water Project Loan Program <br /> Project Data Sheet C150396 <br /> Borrower: Northern Colorado Water Conservancy County: Grand <br /> District,hydropower enterprise <br /> Project Name: Granby Hydropower Project Project Type: Hydroelectric <br /> Drainage Basin/District: Colorado/51 Water Source: Colorado River <br /> Total Project Cost: $5,669,340 Funding Source: Severance Tax PBF <br /> Type of Borrower: Hydroelectric Average Annual Diversion: 210,000 AF <br /> CWCB Loan: $5,135,183 Interest Rate: 2.0%Term: 30 years <br /> (with 1% service fee) <br /> Northern Water, acting by and through its hydropower enterprise, is applying for a loan for the <br /> construction of the Granby Hydropower Project. The Project is located at the existing Colorado— <br /> Big Thompson Project Granby Dam and will utilize the existing releases to the Colorado River <br /> without changing the flow regime. The hydro station will use the minimum streamflow <br /> obligations and a portion of additional releases to generate power through a 1.2-megawatt <br /> facility. The Project is being performed under the U.S. Bureau of Reclamation's Lease of Power <br /> Privilege (LOPP)process. Power generated will be purchased by Mountain Parks Electric, Inc. <br /> per a 30-year Power Purchase Agreement(PPA). The anticipated Project schedule is to finalize <br /> the LOPP and PPA by October 2014. Construction will occur in the summer/fall of 2015 and is <br /> expected to be operational by May 2016. <br /> Rocky Mountain " a7 <br /> Natrona!=Park t3enho d' <br /> Twtn Sisters Peak East .t h <br /> t25 tr Lon s Peak <br /> .. <br /> f' <br /> t^ '"_ „.- ( .Lyons „ <br /> Halt Ranch Open Space LJ <br /> a <br /> c Maintain <br /> _ <br /> ` \,•,,,,, Longmont tt4. ,t <br /> Het Valley Ranch <br /> x' <br /> . $:- , - c4, Nwrot <br /> Free <br /> Granby <br /> Apache Peak �., r2' ., r§.. *' <br /> Gunbarrel x <br /> ," �e*' S. : File <br /> . Boulder c at a <br /> 119' � Lafayette <br /> f�• Louisville <br /> Nederland •43" S <br /> +Ilt <br /> w , 1 ra; B flaid, 2, <br /> % No glens <br /> a • West=most tmiast T .rntot <br /> L <br /> .< White Ranch Park ,, West • en W <br /> Golden Gate mow - •r <br /> 4.. ` °. Canyoa State Park 43� + /1r4'ad t•m <br /> . ' Wheat Ridge North <br /> ` ,. e r -„5. ° Lakewood ,Gin <br /> r 2;7';° s • Genesee x_ ,, <br />
The URL can be used to link to this page
Your browser does not support the video tag.